Section 3: Subsoil drainage 3.3
3.3
If an active subsoil drain is cut during excavation and if it passes under the building it should be:
a. re-laid in pipes with sealed joints and have access points outside the building; or
b. re-routed around the building; or
c. re-run to another outfall (see Diagram 3).