Appendix A: Key terms

Appendix A: Key terms

NOTE: The items marked * are defined in regulation 44C and 44ZC of and Part R in Schedule 1 to the Building Regulations 2010.

Access point* A physical point located inside or outside the building, accessible to undertakings providing or authorised to provide public communications networks, where connection to the high-speed-ready in-building physical infrastructure, or as the case requires the gigabit-ready physical infrastructure, is made available.

Building control body A local authority building control department or an approved inspector.

Connectivity plan A model form template for developers to provide information to accompany each application for Building Regulations approval containing sections for information that developers are required to provide, including the particulars of connection to a public electronic communications network, and sections for developers to provide further information to assist with the building control process.

Distribution point* A distribution point for a gigabit-capable public electronic communications network (also referred to as a network distribution point).

Dwelling A self-contained unit designed to accommodate a single household, including dwelling houses and flats.

Gigabit-capable electronic communications network* An electronic communications network that is capable of delivering broadband access services at download speeds of at least 1000 Mbps.

Gigabit-capable public electronic communications network* A public electronic communications network that is a gigabit-capable electronic communications network.

Gigabit-ready physical infrastructure* Physical infrastructure or installations, including elements under joint ownership, intended to host wired or wireless gigabit-capable public electronic communications networks.

High-speed electronic communications network* An electronic communications network which is capable of delivering broadband access services at speeds of at least 30 Mbps.

Network operator A provider of a public electronic communications network.

Network termination point* A physical point at which an occupier is provided with access to high-speed electronic communications networks.

Public electronic communications network Has the meaning given by section 151(1) of the Communications Act 2003.

Relevant 2-year period* The period of 2 years beginning with the earlier of the following:

a. the day on which a building notice, initial notice or public body’s notice relating to work to which this paragraph applies is given;
b. the day on which full plans relating to building work to which this paragraph applies are deposited.

USO-standard public electronic communications network* A public electronic communications network that provides at least the minimum download speed for the time being specified by virtue of section 65(2B)(a) of the Communications Act 2003 in the universal service order (as defined by section 151(1) of that Act).

View this page on RegsUK