Risk assessment 2.28

2.28

The risk assessment process outlined in paragraph 2.8 should also be adopted for methane and other gases. Further investigation for hazardous soil gases may be required where the ground to be covered by the building and/or any land associated with the building is:

a. On a landfill site, within 250m of the boundary of a landfill site or where there is suspicion that it is within the sphere of influence of such a site. The Environment Agency’s policy on building development on or near to landfills should be followed.
b. On a site subject to the wide scale deposition of biodegradable substances (including made ground or fill).
c. On a site that has been subject to a use that could give rise to petrol, oil or solvent spillages.
d. In an area subject to naturally occurring methane, carbon dioxide and other hazardous gases (e.g. hydrogen sulphide).

View this page on RegsUK