Solid and liquid contaminants Risk assessment
Risk assessment
General concepts
2.6
To ensure safe development of land affected by contaminants the principles of risk assessment (as set out in paragraph 2.8 below) should be followed. The general approach is founded on the concept of the ‘source–pathway– receptor’ relationship, or pollutant linkage, where source refers to contaminants in or on the ground. This is illustrated by the conceptual model34 in Diagram 2.
2.7
When land affected by contaminants is developed, receptors (i.e. buildings, building materials and building services, as well as people) are introduced onto the site and so it is necessary to break the pollutant linkages or condition them so that they do not pose a significant risk. This can be achieved by:
34 The conceptual model is a textual or schematic hypothesis of the nature and sources of contamination, the pollution migration pathways and potential receptors, developed on the basis of the information from a preliminary assessment, and is refined during subsequent phases of investigation.
Stages of risk assessment
2.8
In assessing the risks for land contamination a tiered approach is adopted with an increasing level of detail required in progressing through the tiers. The three tiers are: preliminary risk assessment, generic quantitative risk assessment (GQRA) and detailed quantitative risk assessment (DQRA). Once the need for a risk assessment has been identified, it will always be necessary to undertake a preliminary risk assessment but, depending on the situation and the outcome, it may not be appropriate to do a more detailed risk assessment. Alternatively, it may be necessary to do only one or both of the more detailed risk assessments. For each tier, the model procedures for the management of land contamination (CLR 1143) describes the stages of risk assessment that should be followed for identifying risks and making judgements about the consequences of land affected by contamination when developing a site. These are outlined below:
2.9
Guidance on the investigation of sites potentially affected by contaminants is provided in:
They recommend a risk based approach to identify and quantify the hazards that may be present and the nature of the risk they may pose. They describe the design and execution of field investigations, including suitable sample distribution strategies, sampling and testing.
Hazard identification and assessment
2.10
A preliminary site assessment is required to provide information on the past and present uses of the site and surrounding area that may give rise to contamination (see Table 2). During the site walk-over there may be signs of possible contaminants (see Table 3). The information collated from the desk study and site walk-over can assist and will dictate the design of the exploratory and detailed ground investigation.
35 Guidelines for combined geoenvironmental and geotechnical investigations, Association of Geotechnical and Geoenvironmental Specialists.
36 BS 5930:1999+A2:2010. Code of practice for site investigations.
37 BS 10175:2011 Code of practice for investigation of potentially contaminated sites.
38 National Groundwater & Contaminated Land Centre report NC/99/38/2 Guide to good practice for the development of conceptual models and the selection and application of mathematical models of contaminant transport processes in the subsurface.
41 Human health toxicological assessment of contaminants in soil (Science report – final SC050021/SR2), Environment Agency. http://www.environment-gency.gov.uk/static/documents/Research/TOX_guidance_report_-_final.pdf
42 Updated technical background to the CLEA model (Science Report: SC050021/SR3), Environment Agency. http://www.environment-agency.gov.uk/static/documents/Research/CLEA_report_-_final.pdf
43 CLR 11. Model Procedures for the Management of Land Contamination. Defra/Environment Agency, 2004. www.environment-agency.gov.uk.
44 Environment Agency R & D Technical Report P5-065 Technical aspects of site investigation, 2000.
45 Environment Agency R & D Technical Report P5-066 Secondary model procedure for the development of appropriate soil sampling strategies for land contamination.
2.11
The site assessment and risk evaluation should pay particular attention to the area of the site subject to building operations. Those parts of the land associated with the building that include the building itself, gardens and other places on the site that are accessible to users of the building and those in and about the building should be remediated to the requirements of the Building Regulations.
There may be a case for a lower level of remediation if part of, or the remainder of, the land associated with the building, or adjacent to such land, is accessible to a lesser extent to the user or those in and about the building than the main parts of the buildings and their respective gardens. This incremental approach may also apply when very large sites are subject to redevelopment in stages; it may be possible to limit remediation to the site that is subject to building operations.
In all cases the risk evaluation and remediation strategy documentation is likely to be appropriate for demonstrating that restricted remediation is acceptable. The onus is on the applicant to show why part of a site may be excluded from particular remediation measures.
Even if the adjacent land is not subject to Building Regulations, which are concerned with health and safety, it may still be subject to planning control legislation or to control under Part IIA of the Environmental Protection Act 1990.
2.12
The Planning Authority should be informed prior to any intrusive investigations or if any substance is found which is at variance with any preliminary statements made about the nature of the site.
Risk estimation and evaluation
2.13
The detailed ground investigation must provide sufficient information for the confirmation of a conceptual model for the site, the risk assessment and the design and specification of any remedial works. This is likely to involve collection and analysis of soil, soil gas, surface and groundwater samples by the use of invasive and/or non-invasive techniques. An investigation of the groundwater regime, levels and flows is essential for most sites since elevated groundwater levels could bring contaminants close to the surface both beneath the building and in any land associated with the building. Expert advice should be sought.
2.14
During the development of land affected by contaminants the health and safety of both the public and workers should be considered46,47.
Table 3 Examples of possible contaminants
| Signs of possible contaminants | Possible contaminant |
|---|---|
| Vegetation (absence, poor or unnatural growth) | Metals Metal compounds |
| Organic compounds Gases (landfill or natural source) | |
| Surface materials (unusal colours and contours may indicate wastes and residues) | Metals Metal compounds |
| Oily and tarry wastes | |
| Asbestos | |
| Other mineral fibres | |
| Organic compounds including phenols | |
| Combustible material including coal and coke dust | |
| Refuse and waste | |
| Fumes and odours (may indicate organic chemicals) | Volatile organic and/or sulphurous compounds from landfill or petrol/ solvent spillage |
| Corrosive liquids | |
| Faecal animal and vegetable matter (biologically active) | |
| Damage to exposed foundations of existing buildings | Sulphates |
| Drums and containers (empty or full) | Various |
| Note: the above list is not exhaustive | |