Section 2: Resistance to contaminants Solid and liquid contaminants

Solid and liquid contaminants

Risk assessment

General concepts

2.6

To ensure safe development of land affected by contaminants the principles of risk assessment (as set out in paragraph 2.8 below) should be followed. The general approach is founded on the concept of the ‘source–pathway– receptor’ relationship, or pollutant linkage, where source refers to contaminants in or on the ground. This is illustrated by the conceptual model34 in Diagram 2.

2.7

When land affected by contaminants is developed, receptors (i.e. buildings, building materials and building services, as well as people) are introduced onto the site and so it is necessary to break the pollutant linkages or condition them so that they do not pose a significant risk. This can be achieved by:

a. treating the contaminant (e.g. use of physical, chemical or biological processes to eliminate or reduce the contaminant’s toxicity or harmful properties);
b. blocking or removing the pathway (e.g. isolating the contaminant beneath protective layers or installing barriers to prevent migration);
c. protecting or removing the receptor (e.g. changing the form or layout of the development, using appropriately designed building materials, etc.);
d. removing the contaminant (e.g. excavating contaminated material).

34 The conceptual model is a textual or schematic hypothesis of the nature and sources of contamination, the pollution migration pathways and potential receptors, developed on the basis of the information from a preliminary assessment, and is refined during subsequent phases of investigation.

Stages of risk assessment

2.8

In assessing the risks for land contamination a tiered approach is adopted with an increasing level of detail required in progressing through the tiers. The three tiers are: preliminary risk assessment, generic quantitative risk assessment (GQRA) and detailed quantitative risk assessment (DQRA). Once the need for a risk assessment has been identified, it will always be necessary to undertake a preliminary risk assessment but, depending on the situation and the outcome, it may not be appropriate to do a more detailed risk assessment. Alternatively, it may be necessary to do only one or both of the more detailed risk assessments. For each tier, the model procedures for the management of land contamination (CLR 1143) describes the stages of risk assessment that should be followed for identifying risks and making judgements about the consequences of land affected by contamination when developing a site. These are outlined below:

a. Hazard identification – developing the conceptual model by establishing contaminant sources, pathways and receptors. This is the preliminary site assessment which consists of a desk study and a site walk-over in order to obtain sufficient information to obtain an initial understanding of the potential risks. An initial conceptual model for the site can be based on this information.
b. Hazard assessment – identifying what pollutant linkages may be present and analysing the potential for unacceptable risks. Collect further information and undertake exploratory site investigation to refine understanding of risks and the likelihood of pollutant linkages. The results may be interpreted using generic criteria and assumptions.
c. Risk estimation – establishing the scale of the possible consequences by considering the degree of harm that may result and to which receptors. Undertake detailed ground investigation to collect sufficient data to estimate the risks the contaminants may pose to defined receptors under defined conditions of exposure.
d. Risk evaluation – deciding whether the risks are acceptable or unacceptable. Review all site data to decide whether estimated risks are unacceptable, taking into account the nature and scale of any uncertainties associated with the risk estimation process.

2.9

Guidance on the investigation of sites potentially affected by contaminants is provided in:

a. the Association of Geotechnical and Geoenvironmental Specialists (AGS) document35;
b. BS 5930:1999+A2:2010. Code of practice for site investigations36;
c. BS 10175:2011 Code of practice for investigation of potentially contaminated sites37;
d. the Environment Agency documents38,41,42,43,44,45.

They recommend a risk based approach to identify and quantify the hazards that may be present and the nature of the risk they may pose. They describe the design and execution of field investigations, including suitable sample distribution strategies, sampling and testing.

Hazard identification and assessment

2.10

A preliminary site assessment is required to provide information on the past and present uses of the site and surrounding area that may give rise to contamination (see Table 2). During the site walk-over there may be signs of possible contaminants (see Table 3). The information collated from the desk study and site walk-over can assist and will dictate the design of the exploratory and detailed ground investigation.

35 Guidelines for combined geoenvironmental and geotechnical investigations, Association of Geotechnical and Geoenvironmental Specialists.

36 BS 5930:1999+A2:2010. Code of practice for site investigations.

37 BS 10175:2011 Code of practice for investigation of potentially contaminated sites.

38 National Groundwater & Contaminated Land Centre report NC/99/38/2 Guide to good practice for the development of conceptual models and the selection and application of mathematical models of contaminant transport processes in the subsurface.

41 Human health toxicological assessment of contaminants in soil (Science report – final SC050021/SR2), Environment Agency. http://www.environment-gency.gov.uk/static/documents/Research/TOX_guidance_report_-_final.pdf

42 Updated technical background to the CLEA model (Science Report: SC050021/SR3), Environment Agency. http://www.environment-agency.gov.uk/static/documents/Research/CLEA_report_-_final.pdf

43 CLR 11. Model Procedures for the Management of Land Contamination. Defra/Environment Agency, 2004. www.environment-agency.gov.uk.

44 Environment Agency R & D Technical Report P5-065 Technical aspects of site investigation, 2000.

45 Environment Agency R & D Technical Report P5-066 Secondary model procedure for the development of appropriate soil sampling strategies for land contamination.

2.11

The site assessment and risk evaluation should pay particular attention to the area of the site subject to building operations. Those parts of the land associated with the building that include the building itself, gardens and other places on the site that are accessible to users of the building and those in and about the building should be remediated to the requirements of the Building Regulations.

There may be a case for a lower level of remediation if part of, or the remainder of, the land associated with the building, or adjacent to such land, is accessible to a lesser extent to the user or those in and about the building than the main parts of the buildings and their respective gardens. This incremental approach may also apply when very large sites are subject to redevelopment in stages; it may be possible to limit remediation to the site that is subject to building operations.

In all cases the risk evaluation and remediation strategy documentation is likely to be appropriate for demonstrating that restricted remediation is acceptable. The onus is on the applicant to show why part of a site may be excluded from particular remediation measures.

Even if the adjacent land is not subject to Building Regulations, which are concerned with health and safety, it may still be subject to planning control legislation or to control under Part IIA of the Environmental Protection Act 1990.

2.12

The Planning Authority should be informed prior to any intrusive investigations or if any substance is found which is at variance with any preliminary statements made about the nature of the site.

Risk estimation and evaluation

2.13

The detailed ground investigation must provide sufficient information for the confirmation of a conceptual model for the site, the risk assessment and the design and specification of any remedial works. This is likely to involve collection and analysis of soil, soil gas, surface and groundwater samples by the use of invasive and/or non-invasive techniques. An investigation of the groundwater regime, levels and flows is essential for most sites since elevated groundwater levels could bring contaminants close to the surface both beneath the building and in any land associated with the building. Expert advice should be sought.

2.14

During the development of land affected by contaminants the health and safety of both the public and workers should be considered46,47.

Table 3 Examples of possible contaminants

Signs of possible contaminantsPossible contaminant
Vegetation (absence, poor or unnatural growth)Metals
Metal compounds
Organic compounds
Gases (landfill or natural source)
Surface materials (unusal colours and contours may indicate wastes and residues)Metals
Metal compounds
Oily and tarry wastes
Asbestos
Other mineral fibres
Organic compounds including phenols
Combustible material including coal and coke dust
Refuse and waste
Fumes and odours (may indicate organic chemicals)Volatile organic and/or sulphurous compounds from landfill or petrol/ solvent spillage
Corrosive liquids
Faecal animal and vegetable matter (biologically active)
Damage to exposed foundations of existing buildingsSulphates
Drums and containers (empty or full)Various
Note: the above list is not exhaustive

Remedial measures

Introduction

2.15

If unacceptable risks to the defined receptor have been identified then these need to be managed through appropriate remedial measures. The risk management objectives are defined by the need to break the pollutant linkages using the methods outlined in paragraph 2.7 and described below. Other objectives will also need to be considered such as timescale, cost, remedial works, planning constraints and sustainability. Depending on the contaminant, three generic types of remedial measures can be considered: treatment, containment and removal. The containment or treatment of waste may require a waste management licence from the Environment Agency.

46 HSE Report HSG 66 Protection of workers and the general public during the development of contaminated land, 1991.

47 CIRIA Report 132 A guide to safe working practices for contaminated land, 1993.

When building work is undertaken on sites affected by contaminants where control measures are already in place, care must be taken not to compromise these measures. For example, cover systems may be breached when new building foundations are constructed, such as when extensions are added.

Treatment

2.16

A wide range of treatment processes is now available for dealing with contaminants. Biological, chemical and physical techniques carried out either in or ex situ exist which may decrease one or more of the following features of the contaminants: mass, concentration, mobility, flux or toxicity. The choice of the most appropriate technique for a particular site is a highly site-specific decision for which specialist advice should be sought.

Containment

2.17

Containment in its widest sense usually means encapsulation of material containing contaminants but in the context of building development containment is often taken to mean cover systems. However, in-ground vertical barriers may also be required to control lateral migration of contaminants.

2.18

Cover systems involve the placement of one or more layers of materials over the site to achieve one or more of the following objectives:

a. break the pollutant linkage between receptors and contaminants;
b. sustain vegetation;
c. improve geotechnical properties; and
d. reduce exposure to an acceptable level.

2.19

Some of the building structures, e.g. foundations, sub-structure and ground floor, may, dependent on the circumstances and construction, contribute to measures to provide effective protection of health from contaminants.

2.20

Imported fill and soil for cover systems should be assessed at source to ensure that it is suitable for use48. Design and dimensioning of cover systems, particularly soil based ones typically used for gardens, should take account of their long-term performance where intermixing of the soil cover with the contaminants in the ground can take place. Maintenance and monitoring may be necessary. Gradual intermixing due to natural effects and activities such as burrowing animals, gardening, etc. needs to be considered. Excavations by householders for garden features, etc. can penetrate the cover layer and may lead to exposure to contaminants. Further guidance on the design, construction and performance of cover layers is given in the Construction Industry Research and Information Association (CIRIA) Report SP12449.

Removal

2.21

This involves the excavation and safe disposal to licensed landfill of the contaminants and contaminated material. Excavation can be targeted to contaminant ‘hot spots’, or it may be necessary to remove sufficient depth of contaminated material to accommodate a cover system within the planned site levels. Removal may not be viable depending on the extent and depth of the contaminants on the site and the availability of suitably licensed landfills. Imported fill should be assessed at source to ensure that there are no materials that will pose unacceptable risks to potential receptors.

2.22

Further detailed guidance on all three types of remedial measure is given in the Environment Agency/NHBC R & D Publication 66 referred to above and in a series of CIRIA publications50–55.

Risks to buildings, building materials and services

2.23

The hazards to buildings, building materials and services on sites affected by contaminants need to be considered since these are also receptors. The hazards to consider are:

a. Aggressive substances. These include inorganic and organic acids, alkalis, organic solvents and inorganic chemicals such as sulphates and chlorides which may affect the long-term durability of construction materials (such as concrete, metals and plastics).
b. Combustible fill. This includes domestic waste, colliery spoil, coal, plastics, petrol-soaked ground, etc. which, if ignited, may lead to subterranean fires and consequent damage to the structural stability of buildings, and the integrity or performance of services.
c. Expansive slags. The two main types are blast furnace and steel making slag which may expand some time after deposition – usually when water is introduced onto the site – causing damage to buildings and services.

48 BS 3882:1994 Specification for topsoil.

49 CIRIA Special Publication SP124 Barriers, liners and cover systems for containment and control of land contamination, 1996.

50 CIRIA Special Publication SP102 Decommissioning, decontamination and demolition, 1995.

51 CIRIA Special Publication SP104 Classification and selection of remedial methods, 1995.

52 CIRIA Special Publication SP105 Excavation and disposal, 1995.

53 CIRIA Special Publication SP106 Containment and hydraulic measures, 1996.

54 CIRIA Special Publication SP107 Ex-situ remedial methods for soils, sludges and sediments, 1995.

55 CIRIA Special Publication SP109 In-situ methods of remediation, 1995.

d. Floodwater affected by contaminants. Substances in the ground, waste matter or sewage may contaminate floodwater. This contaminated water may affect building elements, such as walls or ground floors, that are close to or in the ground. Guidance on flood resilient construction can be found in Improving the flood performance of new buildings – Flood resilient construction8.

2.24

Although the building and building materials are the main receptors with these hazards, ultimately there could be harm to health. A particular concern is the effect of hydrocarbons permeating potable water pipes made of polyethylene. Guidance on reducing these risks is given in a Water Research Centre report58. Further guidance on the assessment and management of risks to building materials is given in an Environment Agency document59.