Application 1.10

1.10

For example, if there is a point that is as close to the distribution point as the developer can extend the gigabit-ready physical infrastructure to, but this would not be reasonably practicable for the developer due to the condition of the land in question, the infrastructure should be extended to an alternative point that is reasonably practicable. Developers are encouraged to work with relevant network operators to identify suitable routes for such infrastructure.

View this page on RegsUK