Application 1.11

1.11

Where the developer has no right over the land in question and where no connection to a gigabit-capable public electronic communications network is being provided because requirement RA2 is excluded or modified, and would be even if the gigabit-ready physical infrastructure was required to reach as close as is reasonably practicable to the distribution point, the developer is required to install the infrastructure to a point as close as is reasonably practicable to a location at which it reasonably expects a distribution point to be installed within the relevant 2-year period, i.e. a likely future location (see Diagram 3a).

View this page on RegsUK