Application 1.13

1.13

The developer will need to provide evidence to a building control body of the steps undertaken to establish if an appropriate network distribution point is to be installed within the relevant 2-year period and where it is to be located. Developers will also need to provide evidence of the steps undertaken should it be the case that there is no likely future location of an appropriate network distribution point within the relevant 2-year period. Developers should ascertain this information from a network operator when inviting them to provide a relevant connection.