Application 1.14

1.14

Where there is no likely future location of a network distribution point that is closer to the dwelling than an existing distribution point and the developer cannot access land to a distant network distribution point, the developer is required to install infrastructure to an access point (see Diagram 3b).

View this page on RegsUK