Application 1.15
1.15
Where there is no right to install gigabit-ready physical infrastructure in land beyond the building, the developer is required to install gigabit-ready physical infrastructure to an access point for an individual dwelling and to a common access point for buildings containing multiple dwellings (see Diagrams 4a and 4b).