Application 1.8

1.8

Requirement RA1 requires that the developer installs gigabit-ready physical infrastructure from the network termination point to the network distribution point, where the developer has access rights over the relevant land (see Diagram 1).

NOTE: All the diagrams in this approved document (Diagrams 1 to 6) are simplified. Developers should refer to specific guidance and the requirements of the Building Regulations when planning gigabit-ready physical infrastructure with network operators.

NOTE: All the diagrams in this approved document (Diagrams 1 to 6) reflect full fibre gigabit-ready physical infrastructure. Where fixed wireless access or satellite technology is deployed, such infrastructure will be installed differently. Diagrams 5 and 6 provide more detail on gigabit-ready physical infrastructure inside the dwelling.