Section 17: Access to buildings for firefighting personnel Location of firefighting shafts

Location of firefighting shafts

17.7

Firefighting shafts and protected stairways should be positioned such that every part of each storey more than 18m above the fire and rescue service vehicle access level complies with the maximum distances given in paragraph 17.8. Distances should be measured from the fire main outlet on a route suitable for laying a hose.

NOTE: If the internal layout is not known, the distance should be measured at two-thirds of the direct distance.

17.8

In any building, the hose laying distance should meet all of the following conditions.

a. A maximum of 60m from the fire main outlet in a firefighting shaft (see Diagram 17.3).
b. Additionally, where sprinklers have not been provided in accordance with Appendix E, the hose laying distance should be a maximum of 45m from a fire main outlet in a protected shaft (although this does not imply that the protected shaft needs to be designed as a firefighting shaft (see Diagram 17.3).

Diagram 17.3 Location of firefighting shafts: hose laying distances

Diagram 17.3 Location of firefighting shafts: hose laying distances. Wording on the drawing: See para 17.8; With sprinklers; a.; b.; F; F F; 60m; Without sprinklers; c.; 45m; Floor plan within 60m hose laying distance of fire main outlet; Floor plan within 45m hose laying distance of fire main outlet; F; Hose reach; F H; Firefighting shaft; 60m; Fire main outlet in a protected shaft; Additional hose coverage required; d.; e.; H; F H; F F; 45m; H; NOTES:; 1. Hose laying distance should be measured from the fire main outlet along the route suitable for laying hose. If this route is not known, the distance should be taken at two-thirds of the direct distance.; 2. The fire main outlet should be located according to paragraph 16.4.
Diagram 17.3 Location of firefighting shafts: hose laying distances