Remedial measures 2.36

2.36

If the risks posed by the gas are unacceptable then these need to be managed through appropriate building remedial measures. Site-wide gas control measures may be required if the risks on any land associated with the building are deemed unacceptable. Such control measures include removal of the gas generating material or covering together with gas extraction systems. Further guidance is contained in CIRIA Report 14972. Generally speaking, expert advice should be sought in these circumstances.