Technical solution 4.14

4.14

Unless it is covered with a floor finish which is highly vapour resistant (in which case see the Alternative approach in paragraph 4.16), a suspended timber floor next to the ground may be built as follows (Diagram 5):

a. Ground covering either:
i. unreinforced concrete at least 100mm thick to mix ST 1 in BS 850089. The concrete should be laid on a compacted hardcore bed of clean, broken brick or any other inert material free from materials including water-soluble sulphates in quantities which could damage the concrete; or
ii. concrete, composed as described above, or inert fine aggregate, in either case at least 50mm thick laid on at least 300µm (1200 gauge) polyethylene sheet with sealed joints, and itself laid on a bed of material which will not damage the sheet.

To prevent water collecting on the ground covering, either the top should be entirely above the highest level of the adjoining ground or, on sloping sites, consideration should be given to installing drainage on the outside of the up-slope side of the building (see Diagram 6).

b. Ventilated air space measuring at least 75mm from the ground covering to the underside of any wall-plates and at least 150mm to the underside of the suspended timber floor (or insulation if provided). Two opposing external walls should have ventilation openings placed so that the ventilating air will have a free path between opposite sides and to all parts. The openings should be not less than either 1,500mm2/m run of external wall or 500mm2/m2 of floor area, whichever gives the greater opening area. Any pipes needed to carry ventilating air should have a diameter of at least 100mm. Ventilation openings should incorporate suitable grilles which prevent the entry of vermin to the sub-floor but do not resist the air flow unduly. If floor levels need to be nearer to the ground to provide level access sub-floor ventilation can be provided through offset (periscope) ventilators.

89 BS 8500-1:2002 Concrete. Complementary British Standard to BS EN 206-1 Method of specifying and guidance for the specifier.

c. Damp-proof courses of impervious sheet material, engineering brick or slates in cement mortar or other material which will prevent the passage of moisture. Guidance for choice of materials is given in BS 5628:Part 3:200190.
d. In shrinkable clay soils, the depth of the air space may need to be increased to allow for heave.