Technical solution 4.18

4.18

One solution for a suspended concrete floor could be:

a. in situ concrete at least 100mm thick (but thicker if the structural design requires) containing at least 300kg of cement for each m3 of concrete; or
b. precast concrete construction with or without infilling slabs; and
c. reinforcing steel protected by concrete cover of at least 40mm if the concrete is in situ and at least the thickness required for a moderate exposure if the concrete is precast.