Appendix B: Compliance checklist
Appendix B: Compliance checklist
B1
This compliance checklist is divided into three parts, as follows.
a. Part 1 contains the building details and declarations.
b. Part 2a functions as a design checklist for the simplified approach detailed in Section 1.
c. Part 2b functions as a design checklist for the dynamic thermal modelling approach detailed in Section 2.
d. Part 3 is for verifying the completion details of the as-built residential building.
B2
All three parts of the compliance checklist should be completed. The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.
B3
A copy of this checklist, or a similar checklist, may be submitted to the building control body as evidence that the building has been constructed as designed to reduce the risk of overheating.
Part 1 – Building details and declarations
The designer should complete this section.
| 1.1 | Building and site details | |
|---|---|---|
| Residential building name/number | ||
| Street | ||
| Town | ||
| County | ||
| Postcode | ||
| Proposed building use/type of building | ||
| Are there any security, noise or pollution issues? | ||
| 1.2 | Designer’s details | |
| Designer’s name | ||
| Company | ||
| Address line 1 | ||
| Address line 2 | ||
| Postcode | ||
| Telephone number | ||
| Email address | ||
Part 2 – Design details
The designer should complete either Part 2a or 2b, depending on the method used.
Part 2a – Simplified method (as detailed in Section 1)
| 2a.1 | Site details | |
|---|---|---|
| Site location, assigned using paragraph 1.3(1) | ||
| Building category, assigned using paragraph 1.4 | ||
| 2a.2 | Designed overheating mitigation strategy | |
| Details of standards selected: | ||
| a. Maximum area of glazing | ||
b. Maximum area of glazing in the most glazed room | ||
| c. Shading strategy | ||
| d. Total minimum free area | ||
| e. Bedroom minimum free area | ||
| 2a.3 | Designer’s declaration | |
| Designer’s name | ||
| Designer’s organisation | ||
| Designer’s signature | ||
| Registration number (if applicable) | ||
| Date of design | ||
NOTE:
1. All references to paragraphs are to Approved Document O.
Part 2b – Dynamic thermal modelling method (as detailed in Section 2)
| 2b.1 | Modelling details | |||
|---|---|---|---|---|
| Dynamic software name and version | ||||
| Weather file location used, including any additional, more extreme weather files | ||||
| Number of sample units modelled, including an explanation of why the size/selection has been chosen | ||||
| 2b.2 | Modelled occupancy | |||
| Has the project passed the assessment described in CIBSE’s TM59, taking into account the limits detailed in paragraphs 2.5 and 2.6?(1) | Yes | No | ||
| Details of the occupancy profiles used | ||||
| Details of the equipment profiles used | ||||
| Details of the opening profiles used | ||||
| 2b.3 | Modelled overheating mitigation strategy | |||
| Free areas | ||||
| Infiltration and mechanical flow rates | ||||
| Window g-value | ||||
| Shading strategy | ||||
| Mechanical cooling | ||||
| 2b.4 | Modelling results | |||
| Has the project passed the assessment described in CIBSE’s TM59, taking into account the limits detailed in paragraphs 2.5 and 2.6? | Yes | No | ||
| What is the overall overheating strategy (i.e. what design features are key to the project passing)? | ||||
| 2b.5 | Designer’s declaration | |||
| Has the building construction proposal been modelled accurately? | Yes | No | ||
| Designer’s name | ||||
| Designer’s organisation | ||||
| Designer’s signature | ||||
| Registration number (if applicable) | ||||
| Date of design | ||||
NOTE:
1. All references to paragraphs are to Approved Document O.
Part 3 – Completion details
Both the builder and the building control body inspector should complete this section.
| 3.1 | Builder’s declaration | |||
|---|---|---|---|---|
| Has the residential building been constructed and completed according to the specifications set out in Parts 1 and 2 of this checklist? | Yes | No | ||
| Builder’s name | ||||
| Builder’s organisation | ||||
| Builder’s signature | ||||
| Date of signature | ||||
| 3.2 | Building control body inspector’s declaration | |||
| Is the residential building’s construction consistent with the details provided in Parts 1 and 2 of this checklist? | Yes | No | ||
| Inspector’s name | ||||
| Inspector’s signature | ||||
| Registration number (if applicable) | ||||
| Date of inspection | ||||