Appendix B: Compliance checklist Part 2 – Design details
Part 2 – Design details
The designer should complete either Part 2a or 2b, depending on the method used.
Part 2a – Simplified method (as detailed in Section 1)
| 2a.1 | Site details | |
|---|---|---|
| Site location, assigned using paragraph 1.3(1) | ||
| Building category, assigned using paragraph 1.4 | ||
| 2a.2 | Designed overheating mitigation strategy | |
| Details of standards selected: | ||
| a. Maximum area of glazing | ||
b. Maximum area of glazing in the most glazed room | ||
| c. Shading strategy | ||
| d. Total minimum free area | ||
| e. Bedroom minimum free area | ||
| 2a.3 | Designer’s declaration | |
| Designer’s name | ||
| Designer’s organisation | ||
| Designer’s signature | ||
| Registration number (if applicable) | ||
| Date of design | ||
NOTE:
1. All references to paragraphs are to Approved Document O.
Part 2b – Dynamic thermal modelling method (as detailed in Section 2)
| 2b.1 | Modelling details | |||
|---|---|---|---|---|
| Dynamic software name and version | ||||
| Weather file location used, including any additional, more extreme weather files | ||||
| Number of sample units modelled, including an explanation of why the size/selection has been chosen | ||||
| 2b.2 | Modelled occupancy | |||
| Has the project passed the assessment described in CIBSE’s TM59, taking into account the limits detailed in paragraphs 2.5 and 2.6?(1) | Yes | No | ||
| Details of the occupancy profiles used | ||||
| Details of the equipment profiles used | ||||
| Details of the opening profiles used | ||||
| 2b.3 | Modelled overheating mitigation strategy | |||
| Free areas | ||||
| Infiltration and mechanical flow rates | ||||
| Window g-value | ||||
| Shading strategy | ||||
| Mechanical cooling | ||||
| 2b.4 | Modelling results | |||
| Has the project passed the assessment described in CIBSE’s TM59, taking into account the limits detailed in paragraphs 2.5 and 2.6? | Yes | No | ||
| What is the overall overheating strategy (i.e. what design features are key to the project passing)? | ||||
| 2b.5 | Designer’s declaration | |||
| Has the building construction proposal been modelled accurately? | Yes | No | ||
| Designer’s name | ||||
| Designer’s organisation | ||||
| Designer’s signature | ||||
| Registration number (if applicable) | ||||
| Date of design | ||||
NOTE:
1. All references to paragraphs are to Approved Document O.