Modification and exemptions 2.14
Approved Document R: Infrastructure for Electronic Communications, Volume 1: Physical infrastructure and network connection for new dwellings
›
Section 2: Requirement RA2 – connection to gigabit-capable network
›
Modification and exemptions
2.14
The cost cap for each dwelling is £2000 (see paragraphs 2.21 to 2.23).
View this page on RegsUK