Scope of the connectivity plan 3.3

3.3

Part A of the connectivity plan provides sections for the developer to demonstrate the location of the gigabit-ready physical infrastructure. This includes evidence demonstrating why such infrastructure is to be installed up to the point in question, which would be one of the following (as set out in paragraphs 1.8 to 1.15).

a. From a network termination point to a network distribution point.
b. Where the developer has no right over the land in question to reach a network distribution point, from a network termination point to a point as close as is reasonably practicable to a network distribution point.
c. Where the developer has no right over the land in question to reach a network distribution point and requirement RA2 is excluded or modified, and would be so excluded or modified even if the gigabit-ready physical infrastructure were required to reach as close as is reasonably practicable to a network distribution point, to either of the following:
i. a point as close as is reasonably practicable to a likely future location of a network distribution point location in the relevant 2-year period
ii. where there is no likely future location that is closer than the closest network distribution point already installed, from a network termination point to the corresponding access point or common access point.
d. Where the developer does not have access to land beyond the new dwelling, to an access point or common access point.