Section 3: Particulars of connection to public electronic communications network (‘connectivity plan’) Scope of the connectivity plan

Scope of the connectivity plan

3.3

Part A of the connectivity plan provides sections for the developer to demonstrate the location of the gigabit-ready physical infrastructure. This includes evidence demonstrating why such infrastructure is to be installed up to the point in question, which would be one of the following (as set out in paragraphs 1.8 to 1.15).

a. From a network termination point to a network distribution point.
b. Where the developer has no right over the land in question to reach a network distribution point, from a network termination point to a point as close as is reasonably practicable to a network distribution point.
c. Where the developer has no right over the land in question to reach a network distribution point and requirement RA2 is excluded or modified, and would be so excluded or modified even if the gigabit-ready physical infrastructure were required to reach as close as is reasonably practicable to a network distribution point, to either of the following:
i. a point as close as is reasonably practicable to a likely future location of a network distribution point location in the relevant 2-year period
ii. where there is no likely future location that is closer than the closest network distribution point already installed, from a network termination point to the corresponding access point or common access point.
d. Where the developer does not have access to land beyond the new dwelling, to an access point or common access point.

3.4

If an exemption is to be relied on for requirement RA1 or requirement RA2, Part B of the connectivity plan should also be completed and supporting evidence should be included with the connectivity plan when it is submitted. The following information should be provided.

a. Evidence from at least two suitable network operators that demonstrates one of the following.
i. The cost of providing a connection to a gigabit-capable public electronic communications network exceeds the cost cap, with accompanying quotes provided by the suitable network operators.
ii. The suitable network operators refused to provide a gigabit-capable public electronic communications network connection, and evidence demonstrating the reason for this refusal.
iii. The suitable network operators have not responded within the 30 working day period.
b. Also provide evidence in support of any exemption relied upon for requirement RA1 to provide gigabit-ready physical infrastructure.

3.5

Developers can consider which forms of evidence may most effectively support connectivity plan statements, which will vary between development sites. Written evidence, quotes and correspondence will be useful for some purposes. Maps or diagrams may also be useful for indicating infrastructure routes and locations. Estimated timescales as to when infrastructure and connections are to be installed, which will also vary between development sites, are useful supporting evidence.

3.6

Requirements RA1 and RA2 do not oblige network operators to reply to developers where they are contacted for offers to provide a relevant connection. Developers may state in the connectivity plan, with supporting evidence, that at least two suitable network operators have declined to respond to the developer within the 30 working day period. Network operators may also respond to decline to provide connections which the developer can provide as evidence in reliance on the exemption.

3.7

Where an exemption is being relied on, Part B of the connectivity plan should be completed to provide one of the following.

a. Confirmation that the next fastest broadband connection that falls within the cost cap is being installed and include the relevant technical information.
b. If no connection to any public electronic communications network is being provided, offers received from at least two suitable network operators confirming that they have refused to provide any connection to a public electronic communications network, or if no suitable network operator has responded within the 30 working day period, evidence to support this (see paragraph 2.20).
c. If a next fastest broadband connection or no connection is being installed, confirmation that gigabit-ready physical infrastructure will still be installed from each new dwelling erected on the development site to one of the points listed in order of priority, as set out in paragraphs 1.8 to 1.15.

3.8

In addition to the information and particulars required of them under requirements RA1 and RA2, developers must provide all additional required information and particulars when making an application for Building Regulations approval. The connectivity plan does not contain sections for all information and particulars required under the Building Regulations.