Section 3: Particulars of connection to public electronic communications network (‘connectivity plan’)
Section 3: Particulars of connection to public electronic communications network (‘connectivity plan’)
Submitting the connectivity plan
3.1
Before the relevant building work starts, when any relevant notice is provided or application is made to a building control body, the developer must provide certain additional information. This includes particulars of any public electronic communications network to which a connection will be provided and evidence in support of relevant exemptions relied upon.
3.2
A model form connectivity plan is set out in Appendix B which the developer may use or adapt when providing such information.
Scope of the connectivity plan
3.3
Part A of the connectivity plan provides sections for the developer to demonstrate the location of the gigabit-ready physical infrastructure. This includes evidence demonstrating why such infrastructure is to be installed up to the point in question, which would be one of the following (as set out in paragraphs 1.8 to 1.15).
3.4
If an exemption is to be relied on for requirement RA1 or requirement RA2, Part B of the connectivity plan should also be completed and supporting evidence should be included with the connectivity plan when it is submitted. The following information should be provided.
3.5
Developers can consider which forms of evidence may most effectively support connectivity plan statements, which will vary between development sites. Written evidence, quotes and correspondence will be useful for some purposes. Maps or diagrams may also be useful for indicating infrastructure routes and locations. Estimated timescales as to when infrastructure and connections are to be installed, which will also vary between development sites, are useful supporting evidence.
3.6
Requirements RA1 and RA2 do not oblige network operators to reply to developers where they are contacted for offers to provide a relevant connection. Developers may state in the connectivity plan, with supporting evidence, that at least two suitable network operators have declined to respond to the developer within the 30 working day period. Network operators may also respond to decline to provide connections which the developer can provide as evidence in reliance on the exemption.
3.7
Where an exemption is being relied on, Part B of the connectivity plan should be completed to provide one of the following.
3.8
In addition to the information and particulars required of them under requirements RA1 and RA2, developers must provide all additional required information and particulars when making an application for Building Regulations approval. The connectivity plan does not contain sections for all information and particulars required under the Building Regulations.