Section 2: Requirement RA2 – connection to gigabit-capable network Cost cap
Cost cap
2.21
The cost cap for the developer is £2000 for each new dwelling erected, after any financial contribution from the network operator has been deducted.
2.22
The following should be included in costs assessed against the cost cap.
a. Value added tax (VAT).
b. The cost of providing a connection to a gigabit-capable public electronic communications network or other relevant network, from the point of connection at the network termination point at each new dwelling erected on a development to the network distribution point.
NOTE: Costs may include direct costs to the developer and costs to the developer of subcontracting to network operators.
2.23
The following are excluded from costs assessed against the cost cap.
a. The cost to the developer of installing gigabit-ready physical infrastructure in relation to each dwelling erected, including infrastructure in common areas in a building containing more than one dwelling, in accordance with requirement RA1.
b. Administrative costs of the developer, including costs of submitting the connectivity plan and building control body fees as applicable.
c. The cost to an end-user (as defined in section 151(1) of the Communications Act 2003) of the provision of a public electronic communications service.
NOTE: Any financial contribution from the network operator should be deducted from the cost of providing the relevant connection.