Section 2: Requirement RA2 – connection to gigabit-capable network Intention
Intention
2.1
In the Secretary of State’s view, requirement RA2 will be met by installing a relevant connection from a network distribution point to a network termination point at each new dwelling erected on a development site. Requirement RA2 requires developers to install a functioning connection to a gigabit-capable public electronic communications network but does not require developers to secure the provision of a public electronic communications service with an internet service provider.
2.2
Developers should work with network operators to provide a gigabit-capable public electronic communications network connection for each new dwelling erected unless the cost exceeds the cost cap of £2000 per dwelling or the network operator declines to provide a connection.
2.3
Where a gigabit-capable public electronic communications network connection is not being installed because a connection is not offered within the £2000 cost cap, developers should work with network operators to provide the next fastest broadband connection which can be installed without exceeding the £2000 cost cap.
NOTE: Developers may decide to install, for each new dwelling erected, connections to more than one gigabit-capable public electronic communications network. This can be done within one system of gigabit-ready physical infrastructure with capacity to host more than one type of connection. While developers may secure a gigabit-capable public electronic communications network connection from the first suitable network operator with which they engage, they may approach multiple network operators to secure multiple connections on a voluntary basis.
2.4
The connection to a gigabit-capable public electronic communications network can be provided in the following ways.
2.5
The technologies that can currently provide a connection to a gigabit-capable public electronic communications network are set out in the most recent Ofcom Connected Nations report. The 2021 report sets out that relevant technologies include fibre to the premises (‘full fibre’, meaning optical fibre all the way to the dwelling) and other cable types, such as Data Over Cable Service Interface Specification (DOCSIS 3.1) or Fixed Wireless Access (depending on the specific deployment, available capacity at the site, and the number and location of users).
2.6
At least one network termination point should be provided in a suitable position at each new dwelling erected.
NOTE: The network termination point is usually inside the dwelling in an open area. Developers should consider the optimal location of the network termination point and the gigabit-ready physical infrastructure extending to it. In some dwellings, wireless coverage may not extend from the network termination point to all rooms in the dwelling. Some developers may decide to include wired distribution within the dwelling at the time of construction to ensure good connectivity for residents. For further advice see the NHBC Foundation’s NF67 The Connected Home: Designing and Building Technology into Today’s New Homes [2016].
2.7
A fixed electrical supply for the network termination point and associated distribution equipment should be provided at the network termination point.
2.8
The fixed electrical supply should comply with Part P in Schedule 1 to the Building Regulations (Electrical safety – dwellings). For new dwellings, the services and controls for the network termination point and fixed electrical supply, including socket outlets and switches, should be in a position which is easy to reach in accordance with the services and controls guidance supporting Part M in Schedule 1 to the Building Regulations (Access to and use of buildings).