Construction and fixings for cavity barriers 9.13
9.13
Cavity barriers, tested from each side separately, should provide a minimum of both of the following:
a. 30 minutes’ integrity (E 30)
b. 15 minutes’ insulation (I 15).
They may be formed by a construction provided for another purpose if it achieves the same performance.