Section 6: Roofs

Section 6: Roofs

6.1

This section gives guidance for three situations:

a. roofs exposed to precipitation from the outside (see paragraphs 6.3 to 6.9);
b. the risk of interstitial condensation in roofs (see paragraphs 6.10 to 6.13);
c. the risk of condensation or mould growth on the internal surface of roofs (see paragraph 6.14).

6.2

Roofs should:

a. resist the penetration of precipitation to the inside of the building; and
b. not be damaged by precipitation and not carry precipitation to any part of the building which would be damaged by it;
c. be designed and constructed so that their structural and thermal performance are not adversely affected by interstitial condensation.

Roofs (resistance to moisture from the outside)

6.3

Roofing can be designed to protect a building from precipitation either by holding the precipitation at the face of the roof or by stopping it from penetrating beyond the back of the roofing system.

6.4

Any roof will meet the requirement if:

a. it is jointless or has sealed joints, and is impervious to moisture (so that moisture will not enter the roofing system); or
b. it has overlapping dry joints, is impervious or weather resisting, and is backed by a material which will direct precipitation which enters the roof towards the outer face (as with roofing felt).

6.5

Some materials can deteriorate rapidly without special care and they should only be used as the weather-resisting part of a roof if certain conditions are met (see Approved Document 7, Materials and workmanship133). The weather-resisting part of a roofing system does not include paint nor does it include any coating, surfacing or rendering which will not itself provide all the weather resistance.

Technical solution

6.6

Roofing systems may be:

a. impervious including metal, plastic and bituminous products; or
b. weather resisting including natural stone or slate, cement based products, fired clay and wood; or
c. moisture resisting including bituminous and plastic products lapped at the joints, if used as a sheet material, and permeable to water vapour unless there is a ventilated space directly behind the material; or
d. jointless materials and sealed joints, which would allow for structural and thermal movement.

6.7

Dry joints between roofing sheets should be designed so that precipitation will not pass through them, or the system should be designed so that precipitation which enters the joints will be drained away without penetrating beyond the back of the roofing system. Note: Whether dry joints are suitable will depend on the design of the joint or the design of the roofing system and the severity of the exposure to wind and rain.

6.8

Each sheet, tile and section of roof should be fixed in an appropriate manner. Guidance as to appropriate fixing methods is given in BS 8000-6:1990134.

Alternative approach

6.9

The requirement can also be met by following the relevant recommendations of:

a. BS CP 143135 for sheet roof and wall coverings made from the following materials:
Part 1:1958 Corrugated and troughed aluminium
Part 5:1964 Zinc
Part 10:1973 Galvanized corrugated steel
Part 12:1970 (1988) Copper
Part 15:1973 (1986) Aluminium
Part 16:1974 Semi-rigid asbestos bitumen sheets.

Recommendations for lead are included in BS 6915:2001136;

b. BS 8219:2001137;
c. BS 8200:1985138;

133 Approved Document 7: Materials and workmanship, DCLG, 2013 edition.

134 BS 8000-6:1990 Workmanship on building sites. Code of practice for slating and tiling of roofs and claddings.

135 BS CP 143 Code of practice for sheet roof and wall coverings.

136 BS 6915:2001 Design and construction of fully supported lead sheet roof and wall coverings. Code of practice.

137 BS 8219:2001 Installation of sheet roof and wall coverings. Profiled fibre cement. Code of practice.

138 BS 8200:1985 Code of practice for the design of nonloadbearing external vertical enclosures of buildings.

d. MCRMA Technical Paper 6139;
e. MCRMA Technical Paper 9140.

These documents describe the materials and contain design considerations including recommendations for fixing.

Roofs (resistance to damage from interstitial condensation)

6.10

A roof will meet the requirement if it is designed and constructed in accordance with Clause 8.4 of BS 5250:2002141 and BS EN ISO 13788:2002142. Further guidance is given in the BRE Report BR 262143.

6.11

The requirement will be met by the ventilation of cold deck roofs, i.e. those roofs where the moisture from the building can permeate the insulation. For the purposes of health and safety it may not always be necessary to provide ventilation to small roofs such as those over porches and bay windows. Although a part of a roof which has a pitch of 70° or more is to be insulated as though it were a wall, the provisions in this document apply to roofs of any pitch.

6.12

To avoid excessive moisture transfer to roof voids gaps and penetrations for pipes and electrical wiring should be filled and sealed; this is particularly important in areas of high humidity, e.g. bathrooms and kitchens. An effective draught seal should be provided to loft hatches to reduce inflow of warm air and moisture.

6.13

Because of the high internal temperatures and humidities, there is a particular risk of interstitial condensation in the roofs of swimming pools and other buildings in which high levels of moisture are generated; specialist advice should be sought when these are being designed.

Roofs (resistance to surface condensation and mould growth)

6.14

A roof will meet the requirement if:

a. it is designed and constructed so that the thermal transmittance (U-value) does not exceed 0.35W/m2K at any point; and
b. the junctions between elements and the details of openings, such as windows, are designed to Accredited Construction Details99, or follow the guidance of BRE IP17/01145 or MCRMA Paper 14146 for profiled metal roofing.

99 Accredited Construction Details which can be downloaded from www.planningportal.gov.uk/buildingregulations/approveddocuments/partl/bcassociateddocuments9/acd.

139 MCRMA Technical Paper 6 Profiled metal roofing design guide, revised edition, 1996.

140 MCRMA Technical Paper 9 Composite roof and wall cladding panel design guide, 1995.

141 BS 5250:2002 Code of practice for the control of condensation in buildings.

142 BS EN ISO 13788:2002 Hygrothermal performance of building components and building elements. Internal surface temperature to avoid critical surface humidity and interstitial condensation. Calculation methods.

143 BRE Report BR 262 Thermal insulation: avoiding risks, 2002.

145 BRE Information Paper IP17/01 Assessing the effects of thermal bridging at junctions and around openings, 2001.

146 MCRMA Technical Paper 14 Guidance for the design of metal roofing and cladding to comply with approved document L2:2001, 2002.