Construction of compartment walls and compartment floors Junction of compartment wall with roof
Junction of compartment wall with roof
8.25
A compartment wall should achieve both of the following.
8.26
To reduce the risk of fire spreading over the roof from one compartment to another, a 1500mm wide zone of the roof, either side of the wall, should have a covering classified as BROOF(t4), on a substrate or deck of a material rated class A2-s3, d2 or better, as set out in Diagram 8.2a.
Thermoplastic rooflights that, because of paragraph 14.7, are regarded as having a BROOF(t4) classification are not suitable for use in that zone.
8.27
Materials achieving class B-s3, d2 or worse used as a substrate to the roof covering and any timber tiling battens, fully bedded in mortar or other suitable material for the width of the wall (Diagram 8.2b), may extend over the compartment wall in buildings that are both of the following.
8.28
Double-skinned insulated roof sheeting should incorporate a band of material rated class A2-s3, d2 or better, a minimum of 300mm in width, centred over the wall.
8.29
As an alternative to the provisions of paragraph 8.26 or 8.27, the compartment wall may extend through the roof for a minimum of either of the following (see Diagram 8.2c).
Diagram 8.2 Junction of compartment wall with roof