Section 10: Protection of openings and fire-stopping Openings for pipes

Openings for pipes

10.2

Pipes passing through a fire-separating element, unless in a protected shaft, should comply with one of the alternatives A, B or C below.

Alternative A: Proprietary seals (any pipe diameter)

10.3

Provide a proprietary, tested sealing system that will maintain the fire resistance of the wall, floor or cavity barrier.

Alternative B: Pipes with a restricted diameter

10.4

Where a proprietary sealing system is not used, fire-stop around the pipe, keeping the opening for the pipe as small as possible. The nominal internal diameter of the pipe should not exceed the relevant dimension given in Table 10.1.

Alternative C: Sleeving

10.5

A pipe with a maximum nominal internal diameter of 160mm may be used with a sleeve made out of a high melting point metal, as shown in Diagram 10.1, if the pipe is made of one of the following.

a. Lead.
b. Aluminium.
c. Aluminium alloy.
d. Fibre-cement.
e. uPVC (pipes should also comply with either BS 4514 or BS 5255).

A high melting point metal means any metal (such as cast iron, copper or steel) which, if exposed to a temperature of 800°C, will not soften or fracture to the extent that flame or hot gas will pass through the wall of the pipe.

Diagram 10.1 Pipes penetrating fire-separating elements

Diagram 10.1 Pipes penetrating fire-separating elements. Wording on the drawing: See para 10.5; Fire-separating element; NOTES: 1. Make the opening in the fire-separating element as small as possible and provide fire-stopping between pipe and fire-separating element. 2. See Table 10.1 for materials specification. 3. The sleeve should be class A1 rated.; ˜ 1000mm ˜ 1000mm; Pipe specification (b) Sleeve (or pipe) of specification (a) to be in contact Fire-stopping with pipe
Diagram 10.1 Pipes penetrating fire-separating elements

Table 10.1 Maximum nominal internal diameter of pipes passing through a fire-separating element

SituationPipe material and maximum nominal internal diameter (mm)

(a)

High melting point metal(1)

(b)

Lead, aluminium, aluminium alloy, uPVC(2), fibrecement

(c)

Any other material

1. Structure (but not a wall separating buildings) enclosing a protected shaft that is not a stairway or a lift shaft
16011040
2. Any other situation
1604040

NOTES:

1. Any metal (such as cast iron, copper or steel) which, if exposed to a temperature of 800°C, will not soften or fracture to the extent that flame or hot gas will pass through the wall of the pipe.
2. uPVC pipes that comply with either BS 4514 or BS 5255.