Appendix B: Performance of materials, products and structures Fire resistance
Fire resistance
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Fire resistance (2029 amendment).
B18
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B18 (2029 amendment).
Common to all of the provisions of Part B of the Building Regulations is the property of fire resistance. Fire resistance is a measure of one or more of the following.
B19
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B19 (2029 amendment).
The standards of fire resistance necessary for a particular building are based on assumptions about the severity of fires and the consequences should an element fail. Fire severity is estimated in very broad terms from the use of the building (its purpose group), on the assumption that the building contents (which constitute the fire load) are similar for buildings with the same use.
B20
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B20 (2029 amendment).
Because the use of buildings may change, a precise estimate of fire severity based on the fire load due to a particular use may be misleading. Therefore if a fire engineering approach of this kind is adopted, the likelihood that the fire load may change in the future needs to be considered.
B21
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B21 (2029 amendment).
Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with one of the following.
B22
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B22 (2029 amendment).
Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.
B23
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B23 (2029 amendment).
The fire resistance necessary for different circumstances is set out in the following tables.
B24
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B24 (2029 amendment).
This document uses the European classification system for fire resistance set out in BS EN 13501-2 to 4; however, there may be some products lawfully on the market using the classification system set out in previous editions. In those situations the alternative classifications given in Table B1 can be used.
Table B1 Specific provisions of the test for fire resistance of elements of structure, etc.
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Table B1 Specific provisions of the test for fire resistance of elements of structure, etc. (2029 amendment).
| Part of building | Minimum provisions when tested to the relevant European standard (minutes)(1) | Alternative minimum provisions when tested to the relevant part of BS 476(2) (minutes) | Type of exposure | ||
|---|---|---|---|---|---|
| Loadbearing capacity(3) | Integrity | Insulation | |||
1. Structural frame, beam or column. | R see Table B2 | See Table B2 | Not applicable | Not applicable | Exposed faces |
2. Loadbearing wall (for a wall which is also described in any of the following items, the more onerous guidance should be applied). | R see Table B2 | See Table B2 | Not applicable | Not applicable | Each side separately |
3. Floors(4) | |||||
a. between a shop and flat above | REI 60 or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | From underside(5) |
b. in upper storey of two storey dwellinghouse (but not over garage or basement) | R 30 and EI 15 | 30 min | 15 min | 15 min | From underside(5) |
c. any other floor – including compartment floors. | REI see Table B2 | See Table B2 | See Table B2 | See Table B2 | From underside(5) |
4. Roofs | |||||
a. any part forming an escape route | REI 30 | 30 min | 30 min | 30 min | From underside(5) |
b. any roof that performs the function of a floor. | REI see Table B2 | See Table B2 | See Table B2 | See Table B2 | From underside(5) |
5. External walls | |||||
a. any part a maximum of 1000mm from any point on the relevant boundary(6) | REI see Table B2 | See Table B2 | See Table B2 | See Table B2 | Each side separately |
b. any part a minimum of 1000mm from the relevant boundary(6) | RE see Table B2 and I 15 | See Table B2 | See Table B2 | 15 min | From inside the building |
c. any part beside an external escape route (Section 2 Diagram 2.7 of Approved Document B Volume 1 and Section 3, Diagram 3.4). | RE 30 | 30 min | 30 min | No provision(7) (8) | From inside the building |
6. Compartment walls Separating either: | |||||
a. a flat from any other part of the building (see paragraph 7.1 of Approved Document B Volume 1) | REI 60 or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
b. occupancies. | REI 60 or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
7. Compartment walls (other than in item 6 or item 10). | REI see Table B2 | See Table B2 | See Table B2 | See Table B2 | Each side separately |
8. Protected shafts Excluding any firefighting shaft: | |||||
a. any glazing described in Section 8 diagram 8.4 | E 30 | Not applicable | 30 min | No provision(8) | Each side separately |
b. any other part between the shaft and a protected lobby/corridor described in Section 8 diagram 8.4 | REI 30 | 30 min | 30 min | 30 min | Each side separately |
c. any part not described in (a) or (b) above. | REI see Table B2 | See Table B2 | See Table B2 | See Table B2 | Each side separately |
9. Enclosure (that does not form part of a compartment wall or a protected shaft) to a: | |||||
a. protected stairway | REI 30(8) | 30 min | 30 min | 30 min(8) | Each side separately |
b. lift shaft. | REI 30 | 30 min | 30 min | 30 min | Each side separately |
10. Wall or floor separating an attached or integral garage from a dwellinghouse | REI 30(8) | 30 min | 30 min | 30 min(8) | From garage side |
11. Fire resisting construction in dwellinghouses not described elsewhere | REI 30(8) | 30 min | 30 min | 30 min(8) | Each side separately |
12. Firefighting shafts | REI 120 | 120 min | 120 min | 120 min | From side remote from shaft |
a. construction that separates firefighting shaft from rest of building | REI 60 | 60 min | 60 min | 60 min | From shaft side |
b. construction that separates firefighting stair, firefighting lift shaft and firefighting lobby. | REI 60 | 60 min | 60 min | 60 min | Each side separately |
13. Enclosure (that is not a compartment wall or described in item 8) to a: | |||||
a. protected lobby | REI 30(8) | 30 min | 30 min | 30 min(8) | Each side separately |
b. protected corridor. | REI 30(8) | 30 min | 30 min | 30 min(8) | Each side separately |
14. Sub-division of a corridor | REI 30(8) | 30 min | 30 min | 30 min(8) | Each side separately |
15. Fire resisting construction | |||||
a. construction that encloses places of special fire hazard | REI 30 | 30 min | 30 min | 30 min | Each side separately |
b. construction between store rooms and sales area in shops | REI 30 | 30 min | 30 min | 30 min | Each side separately |
c. fire resisting sub-division | REI 30 | 30 min | 30 min | 30 min | Each side separately |
d. construction that encloses bedrooms and ancillary accommodation in care homes. | REI 30 | 30 min | 30 min | 30 min | Each side separately |
16. Enclosure in a flat to a protected entrance hall, or to a protected landing. | REI 30(8) | 30 min | 30 min | 30 min(8) | Each side separately |
17. Cavity barrier | E 30 and I 15 | Not applicable | 30 min | 15 min | Each side separately |
18. Ceiling see paragraph 2.5, Diagram 2.3 of Approved Document B Volume 1 and paragraph 9.5 and Diagram 9.3. | EI 30 | Not applicable | 30 min | 30 min | From underside |
19. Duct described in paragraph 9.17e. | E 30 | Not applicable | 30 min | No provision | From outside |
20. Casing around a drainage system described in Diagram 9.1 of Approved Document B Volume 1. | E 30 | Not applicable | 30 min | No provision | From outside |
21. Flue walls described in Diagram 10.4. | EI half the period given in Table B2 for the compartment wall/floor | Not applicable | Half the period given in Table B2 for the compartment wall/floor | Half the period given in Table B2 for the compartment wall/floor | From outside |
22. Construction described in note (a) to paragraph 12.9 of Approved Document B Volume 1. | EI 30 | Not applicable | 30 min | 30 min | From underside |
23. Fire doorsets | See Table C1 | See Table C1 | See Appendix C | ||
NOTES:
Table B2 Minimum periods of fire resistance
Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Table B2 Minimum periods of fire resistance (2029 amendment).
| Purpose group of building | Minimum periods of fire resistance(1) (minutes) in a: | ||||||
|---|---|---|---|---|---|---|---|
| Basement storey* including floor over | Ground or upper storey | ||||||
| Depth (m) of the lowest basement | Height (m) of top floor above ground, in a building or separated part of a building | ||||||
| More than 10 | Up to 10 | Up to 5 | Up to 11 | Up to 18 | Up to 30 | More than 30 | |
1. Residential: a. Block of flats | |||||||
| – without sprinkler system | 90 min | 60 min | 30 min† | 60 min+§ | Not permitted(2) | Not permitted(2) | Not permitted(2) |
| – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min+§ | 60 min+§ | 90 min+ | 120 min+ |
b. and c. Dwellinghouse | Not applicable(4) | 30 min*† | 30 min† | 60 min(5) | 60 min(5) | Not applicable(4) | Not applicable(4) |
2. Residential | |||||||
a. Institutional | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
b. Other residential | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
3. Office: | |||||||
| – without sprinkler system | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | Not permitted(6) |
| – with sprinkler system(3) | 60 min | 60 min | 30 min† | 30 min† | 30 min† | 60 min | 120 min‡ |
4. Shop and commercial: | |||||||
| – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted(6) |
| – with sprinkler system(3) | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min‡ |
5. Assembly and recreation: | |||||||
| – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted(6) |
| – with sprinkler system(3) | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min‡ |
6. Industrial: | |||||||
| – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted(6) |
| – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
7. Storage and other nonresidential: a. any building or part not described elsewhere: | |||||||
| – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted(6) |
| – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
b. car park for light vehicles: | |||||||
i. open sided car park(7) | Not applicable | Not applicable | 15 min†# | 15 min†#(8) | 15 min†#(8) | 15 min†#(8) | 60 min |
ii. any other car park | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
NOTES:
For single storey buildings, the periods under the heading ‘Up to 5’ apply. If single storey buildings have basements, for the basement storeys the period appropriate to their depth applies.
† For compartment walls that separate buildings, the period is increased to a minimum of 60 minutes.
+ For any floor that does not contribute to the support of the building within a flat of more than one storey, the period is reduced to 30 minutes.
§ For flat conversions, refer to paragraphs 6.5 to 6.7 of Approved Document B Volume 1 regarding the acceptability of 30 minutes.
‡ For elements that do not form part of the structural frame, the period is reduced to 90 minutes.
# For elements that protect the means of escape, the period is increased to 30 minutes.