Appendix B: Performance of materials, products and structures

Appendix B: Performance of materials, products and structures

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Appendix B: Performance of materials, products and structures (2029 amendment).

Introduction

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Introduction (2029 amendment).

B1

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B1 (2029 amendment).

Much of the guidance in this document is given in terms of performance classifications in relation to British or European Standards. In such cases, it will be necessary to demonstrate that a system or product can meet the relevant performance classification. This will be achieved if the system or product complies with one of the following.

a. They should be in accordance with a specification or design that has been shown by specific test(s) to be capable of meeting that performance classification.
b. They should have been designed by using relevant design standards in order to meet that performance classification.
c. They should have been assessed by applying relevant test evidence, in lieu of carrying out a specific test, as being capable of meeting that performance classification.

NOTE: Some products are subject to Classification Without Further Testing (CWFT). For the purposes of this approved document, such products can be considered to have been shown to be capable of meeting a performance specification as per paragraph B1a.

B2

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B2 (2029 amendment).

Any test evidence used to demonstrate the fire performance classification of a product or system should be carefully checked to ensure that it is applicable to the intended use. Small differences in detail, such as fixing method, joints, dimensions, the introduction of insulation materials and air gaps (ventilated or not), might significantly affect the performance and should be tested or assessed in accordance with paragraph B1.

B3

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B3 (2029 amendment).

Assessments should not be regarded as a way to avoid a test where one is necessary. Assessments should only be carried out where sufficient relevant test evidence is available. Relevant test evidence is unlikely to be provided by test standards which have different classification criteria.

B4

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B4 (2029 amendment).

Where it is proposed to assess the classification of a product or system in lieu of carrying out a specific test (as in paragraph B1c), this should be done in accordance with the relevant standard for extended application for the test in question and should include details of the test evidence that has been used to support the assessment.

For performance classifications where there is no specific standard for extended application, assessment reports should be produced in accordance with the principles of BS EN 15725 and should include details of the test evidence that has been used to support the assessment. In cases where the end use application is not covered by the extended application standard and an assessment is the only other suitable approach, then further information on best practice is provided in the Passive Fire Protection Forum’s Guide to Undertaking Technical Assessments of the Fire Performance of Construction Products Based on Fire Test Evidence. The same principle should be followed for assessments as described in paragraph B2.

NOTE: Regulation 7(2) limits components used in or on the external walls of certain buildings to materials achieving class A2-s1, d0 or class A1 (see Section 12). Assessments cannot be used to demonstrate compliance with this requirement.

B5

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B5 (2029 amendment).

Tests and assessments should be carried out by organisations with the necessary expertise. For example, organisations listed as ‘notified bodies’ in accordance with the European Construction Products Regulation or laboratories accredited by the United Kingdom Accreditation Service (UKAS) for the relevant test standard can be assumed to have the necessary expertise.

NOTE: Standard fire tests do not directly measure fire hazard. They measure or assess the response of a material or system to exposure to one or more aspects of fire conditions. Performance in fire tests is only one of a number of factors that should be taken into account.

Reaction to fire

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Reaction to fire (2029 amendment).

B6

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B6 (2029 amendment).

Reaction to fire relates to the degree to which a product will contribute, by its own decomposition, to a fire under specified conditions. Products, other than floorings, are classified as A1, A2, B, C, D, E or F (with class A1 being the highest performance and F being the lowest) in accordance with BS EN 13501-1. Class F is assigned when a product fails to attain class E. Untested products cannot be classified in accordance with BS EN 13501-1.

Materials covered by the Classification Without Further Testing (CWFT) process can be found by accessing the European Commission’s website https://eur-lex.europa.eu/.

B7

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B7 (2029 amendment).

The classes of reaction to fire performance of A2, B, C, D and E are accompanied by additional classifications related to the production of smoke (s1, s2, s3), with s1 indicating the lowest production, and/or flaming droplets/particles (d0, d1, d2), with d0 indicating the lowest production.

NOTE: When a classification includes s3, d2 this means that there is no limit set for smoke production and/or flaming droplets/particles.

B8

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B8 (2029 amendment).

To reduce the testing burden on manufacturers, BS EN 13238 defines a number of standard substrates that produce test results representative of different end use applications. The classification for reaction to fire achieved during testing is only valid when the product is used within this direct field of application, i.e. when the product is fixed to a substrate of that class in its end use. The standard substrate selected for testing should take account of the intended end use applications (field of application) of the product and represent end use substrates that have a density of a minimum of 75% of the standard substrate’s nominal density.

B9

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B9 (2029 amendment).

Standard substrates include gypsum plasterboard (BS EN 520) with a density of 700+/-100kg/m3, calcium silicate board (BS EN 14306) 870+/-50kg/m3 and fibre-cement board 1800+/-200kg/m3.

NOTE: Standard calcium silicate board is not representative of gypsum plasterboard end use (due to the paper layer), but would be representative of most gypsum plasters (with densities of more than 650kg/m3).

NOTE: Classifications based on tests using a plasterboard substrate would also be acceptable for products bonded to a gypsum plaster end use substrate.

Thermoplastic materials

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Thermoplastic materials (2029 amendment).

B10

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B10 (2029 amendment).

Thermoplastic material is any synthetic polymeric material that has a softening point below 200°C if tested to BS EN ISO 306 Method A120. Products formed from these materials cannot always be classified in the normal way. In those circumstances the following approach can be followed.

B11

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B11 (2029 amendment).

Thermoplastic materials used for window glazing, rooflights and lighting diffusers within suspended ceilings do not need to meet the criteria within paragraph B18 onwards, if the guidance to requirements B2 and B4 is followed.

B12

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B12 (2029 amendment).

For the purposes of requirements B2 and B4, thermoplastic materials should be classified as TP(a) rigid, TP(a) flexible or TP(b), as follows:

a. TP(a) rigid
i. rigid solid uPVC sheet
ii. solid (as distinct from double- or multi-skinned) polycarbonate sheet a minimum of 3mm thick
iii. any other rigid thermoplastic product, a specimen of which (at the thickness of the product as put on the market), when tested to BS 2782-0 Method 508A, performs so that both:
• the test flame extinguishes before the first mark
• the duration of flaming or afterglow does not exceed 5 seconds following removal of the burner.
b. TP(a) flexible
Flexible products a maximum of 1mm thick that comply with the Type C requirements of BS 5867-2 when tested to BS 5438 Test 2 with the flame applied to the surface of the specimens for 5, 15, 20 and 30 seconds respectively, but excluding the cleansing procedure; and
c. TP(b)
i. rigid solid polycarbonate sheet products a maximum of 3mm thick, or multi-skinned polycarbonate sheet products that do not qualify as TP(a) by test
ii. other products which, when a specimen of the material between 1.5 and 3mm thick is tested in accordance with BS 2782-0 Method 508A, have a maximum rate of burning of 50mm/minute.
NOTE: If it is not possible to cut or machine a 3mm thick specimen from the product, then a 3mm test specimen can be moulded from the same material as that used to manufacture the product.

B13

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B13 (2029 amendment).

A thermoplastic material alone when used as a lining to a wall or ceiling cannot be assumed to protect a substrate. The surface rating of both thermoplastic material and substrate must therefore meet the required classification.

If, however, the thermoplastic material is fully bonded to a non-thermoplastic substrate, then only the surface rating of the composite needs to meet the required classification.

Roofs

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Roofs (2029 amendment).

B14

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B14 (2029 amendment).

Performance of the resistance of roofs to external fire exposure is measured in terms of penetration through the roof construction and the spread of flame over its surface.

B15

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B15 (2029 amendment).

Roof constructions are classified within the European system as BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) or FROOF(t4) in accordance with BS EN 13501-5. BROOF(t4) indicates the highest performance and FROOF(t4) the lowest.

B16

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B16 (2029 amendment).

BS EN 13501-5 refers to four separate roof tests. The suffix (t4) used in paragraph B15 indicates that Test 4 is to be used for the purposes of this approved document.

B17

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B17 (2029 amendment).

This document uses the European classification system for roof covering set out in BS EN 13501-5; however, there may be some products or systems whose performance will need to be assessed based on the recommendations of paragraphs B1 to B5 as being capable of meeting that performance classification.

Fire resistance

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Fire resistance (2029 amendment).

B18

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B18 (2029 amendment).

Common to all of the provisions of Part B of the Building Regulations is the property of fire resistance. Fire resistance is a measure of one or more of the following.

a. Resistance to collapse (loadbearing capacity), which applies to loadbearing elements only, denoted R in the European classification of the resistance to fire performance.
b. Resistance to fire penetration (integrity), denoted E in the European classification of the resistance to fire performance.
c. Resistance to the transfer of excessive heat (insulation), denoted I in the European classification of the resistance to fire performance.

B19

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B19 (2029 amendment).

The standards of fire resistance necessary for a particular building are based on assumptions about the severity of fires and the consequences should an element fail. Fire severity is estimated in very broad terms from the use of the building (its purpose group), on the assumption that the building contents (which constitute the fire load) are similar for buildings with the same use.

B20

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B20 (2029 amendment).

Because the use of buildings may change, a precise estimate of fire severity based on the fire load due to a particular use may be misleading. Therefore if a fire engineering approach of this kind is adopted, the likelihood that the fire load may change in the future needs to be considered.

B21

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B21 (2029 amendment).

Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with one of the following.

a. BS EN 13501-2.
b. BS EN 13501-3.
c. BS EN 13501-4.

B22

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B22 (2029 amendment).

Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.

B23

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B23 (2029 amendment).

The fire resistance necessary for different circumstances is set out in the following tables.

a. Table B1 gives the specific requirements for each element of structure.
b. Table B2 sets out the minimum periods of fire resistance for elements of structure.
c. Table B3 sets out limitations on the use of uninsulated fire resisting glazed elements.

B24

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B24 (2029 amendment).

This document uses the European classification system for fire resistance set out in BS EN 13501-2 to 4; however, there may be some products lawfully on the market using the classification system set out in previous editions. In those situations the alternative classifications given in Table B1 can be used.

Table B1 Specific provisions of the test for fire resistance of elements of structure, etc.

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Table B1 Specific provisions of the test for fire resistance of elements of structure, etc. (2029 amendment).

Part of buildingMinimum provisions when tested to the relevant European standard (minutes)(1) Alternative minimum provisions when tested to the relevant part of BS 476(2) (minutes)Type of exposure
Loadbearing capacity(3) IntegrityInsulation
1. Structural frame, beam or column.
R see Table B2See Table B2Not applicableNot applicableExposed faces
2. Loadbearing wall (for a wall which is also described in any of the following items, the more onerous guidance should be applied).
R see Table B2See Table B2Not applicableNot applicableEach side separately
3. Floors(4)
a. between a shop and flat above
REI 60 or see Table B2 (whichever is greater)60 min or see Table B2 (whichever is greater)60 min or see Table B2 (whichever is greater)60 min or see Table B2 (whichever is greater)From underside(5)
b. in upper storey of two storey dwellinghouse (but not over garage or basement)
R 30 and EI 1530 min15 min15 minFrom underside(5)
c. any other floor – including compartment floors.
REI see Table B2See Table B2See Table B2See Table B2From underside(5)
4. Roofs
a. any part forming an escape route
REI 3030 min30 min30 minFrom underside(5)
b. any roof that performs the function of a floor.
REI see Table B2See Table B2See Table B2See Table B2From underside(5)
5. External walls
a. any part a maximum of 1000mm from any point on the relevant boundary(6)
REI see Table B2See Table B2See Table B2See Table B2Each side separately
b. any part a minimum of 1000mm from the relevant boundary(6)
RE see Table B2 and I 15See Table B2See Table B215 minFrom inside the building
c. any part beside an external escape route (Section 2 Diagram 2.7 of Approved Document B Volume 1 and Section 3, Diagram 3.4).
RE 3030 min30 minNo provision(7) (8) From inside the building
6. Compartment walls Separating either:
a. a flat from any other part of the building (see paragraph 7.1 of Approved Document B Volume 1)
REI 60 or see Table B2 (whichever is less)60 min or see Table B2 (whichever is less)60 min or see Table B2 (whichever is less)60 min or see Table B2 (whichever is less)Each side separately
b. occupancies.
REI 60 or see Table B2 (whichever is less)60 min or see Table B2 (whichever is less)60 min or see Table B2 (whichever is less)60 min or see Table B2 (whichever is less)Each side separately
7. Compartment walls (other than in item 6 or item 10).
REI see Table B2See Table B2See Table B2See Table B2Each side separately
8. Protected shafts
Excluding any firefighting shaft:
a. any glazing described in Section 8 diagram 8.4
E 30Not applicable30 minNo provision(8) Each side separately
b. any other part between the shaft and a protected lobby/corridor described in Section 8 diagram 8.4
REI 3030 min30 min30 minEach side separately
c. any part not described in (a) or (b) above.
REI see Table B2See Table B2See Table B2See Table B2Each side separately
9. Enclosure (that does not form part of a compartment wall or a protected shaft) to a:
a. protected stairway
REI 30(8) 30 min30 min30 min(8) Each side separately
b. lift shaft.
REI 3030 min30 min30 minEach side separately
10. Wall or floor separating an attached or integral garage from a dwellinghouse
REI 30(8) 30 min30 min30 min(8) From garage side
11. Fire resisting construction in dwellinghouses not described elsewhere
REI 30(8) 30 min30 min30 min(8) Each side separately
12. Firefighting shafts
REI 120120 min120 min120 minFrom side remote from shaft
a. construction that separates firefighting shaft from rest of building
REI 6060 min60 min60 minFrom shaft side
b. construction that separates firefighting stair, firefighting lift shaft and firefighting lobby.
REI 6060 min60 min60 minEach side separately
13. Enclosure (that is not a compartment wall or described in item 8) to a:
a. protected lobby
REI 30(8) 30 min30 min30 min(8) Each side separately
b. protected corridor.
REI 30(8) 30 min30 min30 min(8) Each side separately
14. Sub-division of a corridor
REI 30(8) 30 min30 min30 min(8) Each side separately
15. Fire resisting construction
a. construction that encloses places of special fire hazard
REI 3030 min30 min30 minEach side separately
b. construction between store rooms and sales area in shops
REI 3030 min30 min30 minEach side separately
c. fire resisting sub-division
REI 3030 min30 min30 minEach side separately
d. construction that encloses bedrooms and ancillary accommodation in care homes.
REI 3030 min30 min30 minEach side separately
16. Enclosure in a flat to a protected entrance hall, or to a protected landing.
REI 30(8) 30 min30 min30 min(8) Each side separately
17. Cavity barrier
E 30 and I 15Not applicable30 min15 minEach side separately
18. Ceiling see paragraph 2.5, Diagram 2.3 of Approved Document B Volume 1 and paragraph 9.5 and Diagram 9.3.
EI 30Not applicable30 min30 minFrom underside
19. Duct described in paragraph 9.17e.
E 30Not applicable30 minNo provisionFrom outside
20. Casing around a drainage system described in Diagram 9.1 of Approved Document B Volume 1.
E 30Not applicable30 minNo provisionFrom outside
21. Flue walls described in Diagram 10.4.
EI half the period given in Table B2 for the compartment wall/floorNot applicableHalf the period given in Table B2 for the compartment wall/floorHalf the period given in Table B2 for the compartment wall/floorFrom outside
22. Construction described in note (a) to paragraph 12.9 of Approved Document B Volume 1.
EI 30Not applicable30 min30 minFrom underside
23. Fire doorsets
See Table C1See Table C1See Appendix C

NOTES:

1. BS EN 13501-2 Classification using data from fire resistance tests, excluding ventilation services. BS EN 13501-3 Classification using data from fire resistance tests on products and elements used in building service installations: fire resisting ducts and fire dampers. BS EN 13501-4 Classification using data from fire resistance tests on components of smoke control systems.
In the European classification:
‘R’ is the resistance to fire in terms of loadbearing capacity.
‘E’ is the resistance to fire in terms of integrity.
‘I’ is the resistance to fire in terms of insulation.
The national classifications do not automatically equate with the alternative classifications in the European column, therefore products cannot typically assume a European class unless they have been tested accordingly.
2. BS 476-20 for general principles, BS 476-21 for loadbearing elements, BS 476-22 for non-loadbearing elements, BS 476-23 for fire-protecting suspended ceilings and BS 476-24 for ventilation ducts.
3. Applies to loadbearing elements only (see paragraph B19).
4. Guidance on increasing the fire resistance of existing timber floors is given in BRE Digest 208.
5. Only if a suspended ceiling meets the appropriate provisions should it be relied on to add to the fire resistance of the floor.
6. Such walls may contain areas that do not need to be fire resisting (unprotected areas). See Section 13.
7. Unless needed as part of a wall in item 5a or 5b.
8. Except for any limitations on uninsulated glazed elements given in Table B3.

Table B2 Minimum periods of fire resistance

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Table B2 Minimum periods of fire resistance (2029 amendment).

Purpose group of buildingMinimum periods of fire resistance(1) (minutes) in a:
Basement storey* including floor overGround or upper storey
Depth (m) of the lowest basementHeight (m) of top floor above ground, in a building or separated part of a building
More than 10Up to 10Up to 5Up to 11Up to 18Up to 30More than 30
1. Residential:
a. Block of flats
– without sprinkler system90 min60 min30 min† 60 min+§ Not permitted(2) Not permitted(2) Not permitted(2)
– with sprinkler system(3) 90 min60 min30 min† 60 min+§ 60 min+§ 90 min+120 min+
b. and c. Dwellinghouse
Not applicable(4) 30 min*† 30 min† 60 min(5) 60 min(5) Not applicable(4) Not applicable(4)
2. Residential
a. Institutional
90 min60 min30 min† 60 min60 min90 min120 min‡
b. Other residential
90 min60 min30 min† 60 min60 min90 min120 min‡
3. Office:
– without sprinkler system90 min60 min30 min† 60 min60 min90 minNot permitted(6)
– with sprinkler system(3) 60 min60 min30 min† 30 min† 30 min† 60 min120 min‡
4. Shop and commercial:
– without sprinkler system90 min60 min60 min60 min60 min90 minNot permitted(6)
– with sprinkler system(3) 60 min60 min30 min† 60 min60 min60 min120 min‡
5. Assembly and recreation:
– without sprinkler system90 min60 min60 min60 min60 min90 minNot permitted(6)
– with sprinkler system(3) 60 min60 min30 min† 60 min60 min60 min120 min‡
6. Industrial:
– without sprinkler system120 min90 min60 min90 min90 min120 minNot permitted(6)
– with sprinkler system(3) 90 min60 min30 min† 60 min60 min90 min120 min‡
7. Storage and other nonresidential:
a. any building or part not described elsewhere:
– without sprinkler system120 min90 min60 min90 min90 min120 minNot permitted(6)
– with sprinkler system(3) 90 min60 min30 min† 60 min60 min90 min120 min‡
b. car park for light vehicles:
i. open sided car park(7)
Not applicableNot applicable15 min†# 15 min†#(8) 15 min†#(8) 15 min†#(8) 60 min
ii. any other car park
90 min60 min30 min† 60 min60 min90 min120 min‡

NOTES:

For single storey buildings, the periods under the heading ‘Up to 5’ apply. If single storey buildings have basements, for the basement storeys the period appropriate to their depth applies.

* For the floor over a basement or, if there is more than one basement, the floor over the topmost basement, the higher of the period for the basement storey and the period for the ground or upper storey applies.

† For compartment walls that separate buildings, the period is increased to a minimum of 60 minutes.

+ For any floor that does not contribute to the support of the building within a flat of more than one storey, the period is reduced to 30 minutes.

§ For flat conversions, refer to paragraphs 6.5 to 6.7 of Approved Document B Volume 1 regarding the acceptability of 30 minutes.

‡ For elements that do not form part of the structural frame, the period is reduced to 90 minutes.

# For elements that protect the means of escape, the period is increased to 30 minutes.

1. Refer to note 1, Table B1 for the specific provisions of test.
2. Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system in accordance with Appendix E.
NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.
3. ‘With sprinkler system’ means that the building is fitted throughout with an automatic sprinkler system in accordance with Appendix E.
4. Very large (with a top storey more than 18m above ground level or with a 10m deep basement) or unusual dwellinghouses are outside the scope of the guidance provided with regard to dwellinghouses.
5. A minimum of 30 minutes in the case of three storey dwellinghouses, increased to 60 minutes minimum for compartment walls separating buildings.
6. Buildings within the ‘office’, ‘shop and commercial’, ‘assembly and recreation’, ‘industrial’ and ‘storage and other non-residential’ (except car parks for light vehicles) purpose groups (purpose groups 3 to 7(a)) require sprinklers where there is a top storey more than 30m above ground level.
7. The car park should comply with the relevant provisions in the guidance on requirement B3, Section 11.
8. For the purposes of meeting the Building Regulations, the following types of steel elements are deemed to have satisfied the minimum period of fire resistance of 15 minutes when tested to the European test method.
i. Beams supporting concrete floors, maximum Hp/A=230m-1 operating under full design load.
ii. Free-standing columns, maximum Hp/A=180m-1 operating under full design load.
iii. Wind bracing and struts, maximum Hp/A=210m-1 operating under full design load.
Guidance is also available in BS EN 1993-1-2.

Application of the fire resistance standards in Table B2

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Application of the fire resistance standards in Table B2 (2029 amendment).

B25

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B25 (2029 amendment).

The following guidance should be used when applying the fire resistance standards in Table B2.

a. If one element of structure supports or carries or gives stability to another, the fire resistance of the supporting element should be no less than the minimum period of fire resistance for the other element (whether that other element is loadbearing or not). In some circumstances, it may be reasonable to vary this principle, for example:
i. if the supporting structure is in the open air and is not likely to be affected by the fire in the building
ii. if the supporting structure is in a different compartment, with a fire-separating element (that has the higher standard of fire resistance) between the supporting and the separated structure
iii. if a plant room on the roof needs greater fire resistance than the elements of structure that support it.
b. If an element of structure forms part of more than one building or compartment, that element should be constructed to the standard of the higher of the relevant provisions.
c. If, due to the slope of the ground, one side of a basement is open at ground level (allowing smoke to vent and providing access for firefighting) for elements of structure in that storey it may be appropriate to adopt the standard of fire resistance that applies to above-ground structures.
d. Although most elements of structure in a single storey building may not need fire resistance, fire resistance is needed if one of the following applies to the element.
i. It is part of, or supports, an external wall, and there is provision in the guidance on requirement B4 to limit the extent of openings and other unprotected areas in the wall.
ii. It is part of, or supports, a compartment wall, including a wall that is common to two or more buildings.
iii. It supports a gallery.

B26

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: B26 (2029 amendment).

For the purposes of this paragraph, the ground storey of a building that has one or more basement storeys and no upper storeys may be considered as a single storey building. The fire resistance of the basement storeys should be that specified for basements.

Table B3 Limitations on the use of uninsulated glazed elements on escape routes. These limitations do not apply to glazed elements that satisfy the relevant insulation criterion, see Table B1

Applies until 1 September 2029. From 2 September 2029 the 2029 amendment applies instead: Table B3 Limitations on the use of uninsulated glazed elements on escape routes. These limitations do not apply to glazed elements that satisfy the relevant insulation criterion, see Table B1 (2029 amendment).

Position of glazed elementMaximum total glazed area in parts of a building with access to:
A single stairMore than one stair
WallsDoor leafWallsDoor leaf
Flats
1. Within the enclosures of a protected entrance hall or protected landing, or within fire resisting separation shown in Section 3, Diagram 3.4, of Approved Document B Volume 1.
Fixed fanlights onlyUnlimited above 1100mm from floorFixed fanlights onlyUnlimited above 1100mm from floor
Dwellinghouses
2. Within either:
a. the enclosures of a protected stairway
b. fire resisting separation shown in Diagram 2.2 of Approved Document B Volume 1.
Unlimited above 1100mm from floor or pitch of the stairUnlimitedUnlimited above 1100mm from floor or pitch of the stairUnlimited
3. Within fire resisting separation either:
a. shown in Diagram 2.4 of Approved Document B Volume 1
b. described in paragraph 2.16b of Approved Document B Volume 1.
Unlimited above 100mm from floorUnlimited above 100mm from floorUnlimited above 100mm from floorUnlimited above 100mm from floor
4. Existing window between an attached/ integral garage and the dwellinghouse.
UnlimitedNot applicableUnlimitedNot applicable
5. Adjacent to an external escape stair (see paragraph 2.17 and Diagram 2.7 of Approved Document B Volume 1) or roof escape route (see paragraph 2.13 of Approved Document B Volume 1).
UnlimitedUnlimitedUnlimitedUnlimited
General (except dwellinghouses)
6. Between residential/sleeping accommodation and a common escape route (corridor, lobby or stair).
NilNilNilNil
7. Between a protected stairway(1) and either:
a. the accommodation
b. a corridor that is not a protected corridor other than in item 6 above.
Nil25% of door areaUnlimited above 1100mm(2) 50% of door area
8. Between either:
a. a protected stairway(1) and a protected lobby or protected corridor
b. accommodation and a protected lobby other than in item 6 above.
Unlimited above 1100mm from floorUnlimited above 100mm from floorUnlimited above 100mm from floorUnlimited above 100mm from floor
9. Between the accommodation and a protected corridor that forms a dead end, other than in item 6 above.
Unlimited above 1100mm from floorUnlimited above 100mm from floorUnlimited above 1100mm from floorUnlimited above 100mm from floor
10. Between accommodation and any other corridor, or subdividing corridors, other than in item 6 above.
Not applicableNot applicableUnlimited above 100mm from floorUnlimited above 100mm from floor
11. Beside an external escape route.
Unlimited above 1100mm from floorUnlimited above 1100mm from floorUnlimited above 1100mm from floorUnlimited above 1100mm from floor
12. Beside an external escape stair (see paragraph 3.32 and Diagram 3.4) or roof escape route (see paragraph 2.32).
UnlimitedUnlimitedUnlimitedUnlimited

NOTES:

Items 1 and 8 apply also to single storey buildings.

Fire resisting glass should be marked with the name of the manufacturer and the name of the product.

Further guidance can be found in A Guide to Best Practice in the Specification and Use of Fire-resistant Glazed Systems published by the Glass and Glazing Federation.

1. If the protected stairway is also a protected shaft or a firefighting stair (see Section 17), there may be further restrictions on the use of glazed elements.
2. Measured vertically from the landing floor level or the stair pitch line.
3. The 100mm limit is intended to reduce the risk of fire spreading from a floor covering.