Appendix B: Performance of materials, products and structures (2029 amendment)
Appendix B: Performance of materials, products and structures (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Appendix B: Performance of materials, products and structures.
Introduction (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Introduction.
B1 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B1.
The guidance in this document is given in terms of performance classifications in relation to European Standards. In such cases, it will be necessary to demonstrate that a system or product can meet the relevant performance classification. This will be achieved if the system or product complies with one of the following.
NOTE: Some products are subject to Classification Without Further Testing (CWFT). For the purposes of this approved document, such products can be considered to have been shown to be capable of meeting a performance specification as per paragraph B1a.
B2 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B2.
Any test evidence used to demonstrate the fire performance classification of a product or system should be carefully checked to ensure that it is applicable to the intended use. Small differences in detail, such as fixing method, joints, dimensions, the introduction of insulation materials and air gaps (ventilated or not), might significantly affect the performance and should be tested or assessed in accordance with paragraph B1.
B3 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B3.
Assessments should not be regarded as a way to avoid a test where one is necessary. Assessments should only be carried out where sufficient relevant test evidence is available. Relevant test evidence is unlikely to be provided by test standards which have different classification criteria.
B4 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B4.
Where it is proposed to assess the classification of a product or system in lieu of carrying out a specific test (as in paragraph B1c), this should be done in accordance with the relevant standard for extended application for the test in question and should include details of the test evidence that has been used to support the assessment.
For performance classifications where there is no specific standard for extended application, assessment reports should be produced in accordance with the principles of BS EN 15725 and should include details of the test evidence that has been used to support the assessment. In cases where the end use application is not covered by the extended application standard and an assessment is the only other suitable approach, then further information on best practice is provided in the Passive Fire Protection Forum’s Guide to Undertaking Technical Assessments of the Fire Performance of Construction Products Based on Fire Test Evidence. The same principle should be followed for assessments as described in paragraph B2.
NOTE: Regulation 7(2) limits components used in or on the external walls of certain buildings to materials achieving class A2-s1, d0 or class A1 (see Section 12). Assessments cannot be used to demonstrate compliance with this requirement.
B5 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B5.
Tests and assessments should be carried out by organisations with the necessary expertise. For example, organisations listed as ‘notified bodies’ in accordance with the European Construction Products Regulation or laboratories accredited by the United Kingdom Accreditation Service (UKAS) for the relevant test standard can be assumed to have the necessary expertise.
NOTE: Standard fire tests do not directly measure fire hazard. They measure or assess the response of a material or system to exposure to one or more aspects of fire conditions. Performance in fire tests is only one of a number of factors that should be taken into account.
Reaction to fire (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Reaction to fire.
B6 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B6.
Reaction to fire relates to the degree to which a product will contribute, by its own decomposition, to a fire under specified conditions. Products, other than floorings, are classified as A1, A2, B, C, D, E or F (with class A1 being the highest performance and F being the lowest) in accordance with BS EN 13501-1. Class F is assigned when a product fails to attain class E. Untested products cannot be classified in accordance with BS EN 13501-1.
Materials covered by the Classification Without Further Testing (CWFT) process can be found by accessing the European Commission’s website https://eur-lex.europa.eu/.
B7 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B7.
The classes of reaction to fire performance of A2, B, C, D and E are accompanied by additional classifications related to the production of smoke (s1, s2, s3), with s1 indicating the lowest production, and/or flaming droplets/particles (d0, d1, d2), with d0 indicating the lowest production.
NOTE: When a classification includes s3, d2 this means that there is no limit set for smoke production and/or flaming droplets/particles.
B8 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B8.
To reduce the testing burden on manufacturers, BS EN 13238 defines a number of standard substrates that produce test results representative of different end use applications. The classification for reaction to fire achieved during testing is only valid when the product is used within this direct field of application, i.e. when the product is fixed to a substrate of that class in its end use. The standard substrate selected for testing should take account of the intended end use applications (field of application) of the product and represent end use substrates that have a density of a minimum of 75% of the standard substrate’s nominal density.
B9 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B9.
Standard substrates include gypsum plasterboard (BS EN 520) with a density of 700+/-100kg/m3, calcium silicate board (BS EN 14306) 870+/-50kg/m3 and fibre-cement board 1800+/-200kg/m3.
NOTE: Standard calcium silicate board is not representative of gypsum plasterboard end use (due to the paper layer), but would be representative of most gypsum plasters (with densities of more than 650kg/m3).
NOTE: Classifications based on tests using a plasterboard substrate would also be acceptable for products bonded to a gypsum plaster end use substrate.
Thermoplastic materials (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Thermoplastic materials.
B10 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B10.
Thermoplastic material is any synthetic polymeric material that has a softening point below 200°C if tested to BS EN ISO 306 Method A120. Products formed from these materials cannot always be classified in the normal way. In those circumstances the following approach can be followed.
B11 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B11.
Thermoplastic materials used for window glazing, rooflights and lighting diffusers within suspended ceilings do not need to meet the criteria within paragraph B18 onwards, if the guidance to requirements B2 and B4 is followed.
B12 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B12.
For the purposes of requirements B2 and B4, thermoplastic materials should be classified as TP(a) rigid, TP(a) flexible or TP(b), as follows:
NOTE: If it is not possible to cut or machine a 3mm thick specimen from the product, then a 3mm test specimen can be moulded from the same material as that used to manufacture the product.
B13 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B13.
A thermoplastic material alone when used as a lining to a wall or ceiling cannot be assumed to protect a substrate. The surface rating of both thermoplastic material and substrate must therefore meet the required classification.
If, however, the thermoplastic material is fully bonded to a non-thermoplastic substrate, then only the surface rating of the composite needs to meet the required classification.
Roofs (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Roofs.
B14 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B14.
Performance of the resistance of roofs to external fire exposure is measured in terms of penetration through the roof construction and the spread of flame over its surface.
B15 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B15.
Roof constructions are classified within the European system as BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) or FROOF(t4) in accordance with BS EN 13501-5. BROOF(t4) indicates the highest performance and FROOF(t4) the lowest.
B16 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B16.
BS EN 13501-5 refers to four separate roof tests. The suffix (t4) used in paragraph B15 indicates that Test 4 is to be used for the purposes of this approved document.
B17 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B17.
This document uses the European classification system for roof covering set out in BS EN 13501-5; however, there may be some products or systems whose performance will need to be assessed based on the recommendations of paragraphs B1 to B5 as being capable of meeting that performance classification.
Fire resistance (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Fire resistance.
B18 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B18.
Common to all of the provisions of Part B of the Building Regulations is the property of fire resistance. Fire resistance is a measure of one or more of the following criteria.
B19 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B19.
The standards of fire resistance necessary for a particular building are based on assumptions about the severity of fires and the consequences should an element fail. Fire severity is estimated in very broad terms from the use of the building (its purpose group), on the assumption that the building contents (which constitute the fire load) are similar for buildings with the same use.
B20 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B20.
Because the use of buildings may change, a precise estimate of fire severity based on the fire load due to a particular use may be misleading. Therefore if a fire engineering approach of this kind is adopted, the likelihood that the fire load may change in the future needs to be considered.
B21 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B21.
Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with one of the following.
B22 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B22.
Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.
B23 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B23.
The fire resistance necessary for different circumstances is set out in the following tables.
B24 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B24.
This document uses the European classification system (REI) for fire resistance set out in BS EN 13501-2 to 4. Fire resistance is expressed as REI X, where X is the period of fire resistance in minutes in terms of loadbearing capacity (R), integrity (E) and insulation (I). Products or systems cannot typically assume a European class unless they have been tested and classified accordingly.
B25 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B25.
Products or systems achieving the European classification (REI) should be specified wherever possible. However, there may be some products or systems that have been assessed as being capable of meeting a fire resistance performance classification. When assessed, products or systems should follow the relevant test standards to indicate their fire resistance performance in terms of loadbearing capacity, integrity and insulation based on the recommendations of paragraphs B1 to B5. In those situations, the performance classifications given in Table B1 and Table B2 may be used.
Table B1 Specific provisions of the test for fire resistance of elements of structure, etc. (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Table B1 Specific provisions of the test for fire resistance of elements of structure, etc..
| Part of building | Minimum provisions when tested and classified to the relevant European standard (minutes)(1) or assessed following the recommendations of paragraphs B1 to B5 (minutes)(2) | Type of exposure | ||
|---|---|---|---|---|
| Loadbearing capacity(3) | Integrity | Insulation | ||
1. Structural frame, beam or column. | See Table B2 | Not applicable | Not applicable | Exposed faces |
2. Loadbearing wall (for a wall which is also described in any of the following items, the more onerous guidance should be applied). | See Table B2 | Not applicable | Not applicable | Each side separately |
3. Floors(4) | ||||
a. between a shop and flat above | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | From underside(5) |
b. in upper storey of two storey dwellinghouse (but not over garage or basement) | 30 min | 15 min | 15 min | From underside (5) |
c. any other floor – including compartment floors. | See Table B2 | See Table B2 | See Table B2 | From underside (5) |
4. Roofs | ||||
a. any part forming an escape route | 30 min | 30 min | 30 min | From underside (5) |
b. any roof that performs the function of a floor. | See Table B2 | See Table B2 | See Table B2 | From underside (5) |
5. External walls | ||||
a. any part a maximum of 1000mm from any point on the relevant boundary(6) | See Table B2 | See Table B2 | See Table B2 | Each side separately |
b. any part a minimum of 1000mm from the relevant boundary(6) | See Table B2 | See Table B2 | 15 min | From inside the building |
c. any part beside an external escape route (Section 2, Diagram 2.7 of Approved Document B Volume 1 and Section 3, Diagram 3.4). | 30 min | 30 min | No provision(7) (8) | From inside the building |
6. Compartment walls Separating either: | ||||
a. a flat from any other part of the building (see paragraph 7.1 of Approved Document B Volume 1) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
b. occupancies. | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
7. Compartment walls (other than in item 6 or item 10). | See Table B2 | See Table B2 | See Table B2 | Each side separately |
8. Protected shafts Excluding any firefighting shaft: | ||||
a. any glazing described in Section 8, Diagram 8.4 | Not applicable | 30 min | No provision(8) | Each side separately |
b. any other part between the shaft and a protected lobby/corridor described in Section 8, Diagram 8.4 | 30 min | 30 min | 30 min | Each side separately |
c. any part not described in (a) or (b) above. | See Table B2 | See Table B2 | See Table B2 | Each side separately |
9. Enclosure (that does not form part of a compartment wall or a protected shaft) to a: | ||||
a. protected stairway | 30 min | 30 min | 30 min(8) | Each side separately |
b. lift shaft. | 30 min | 30 min | 30 min | Each side separately |
10. Wall or floor separating an attached or integral garage from a dwellinghouse | 30 min | 30 min | 30 min(8) | From garage side |
11. Fire resisting construction in dwellinghouses not described elsewhere | 30 min | 30 min | 30 min(8) | Each side separately |
12. Firefighting shafts | 120 min | 120 min | 120 min | From side remote from shaft |
a. construction that separates firefighting shaft from rest of building | 60 min | 60 min | 60 min | From shaft side |
b. construction that separates firefighting stair, firefighting lift shaft and firefighting lobby. | 60 min | 60 min | 60 min | Each side separately |
13. Enclosure (that is not a compartment wall or described in item 8) to a: | ||||
a. protected lobby | 30 min | 30 min | 30 min(8) | Each side separately |
b. protected corridor. | 30 min | 30 min | 30 min(8) | Each side separately |
14. Sub-division of a corridor | 30 min | 30 min | 30 min(8) | Each side separately |
15. Fire resisting construction | ||||
a. construction that encloses places of special fire hazard | 30 min | 30 min | 30 min | Each side separately |
b. construction between store rooms and sales area in shops | 30 min | 30 min | 30 min | Each side separately |
c. fire resisting sub-division | 30 min | 30 min | 30 min | Each side separately |
d. construction that encloses bedrooms and ancillary accommodation in care homes. | 30 min | 30 min | 30 min | Each side separately |
16. Enclosure in a flat to a protected entrance hall, or to a protected landing. | 30 min | 30 min | 30 min(8) | Each side separately |
17. Cavity barrier | Not applicable | 30 min | 15 min | Each side separately |
18. Ceiling see see paragraph 2.5, Diagram 2.3 of Approved Document B Volume 1 and paragraph 9.5 and Diagram 9.3. | Not applicable | 30 min | 30 min | From underside |
19. Duct described in paragraph 9.17e. | Not applicable | 30 min | No provision | From outside |
20. Casing around a drainage system described in Diagram 9.1 of Approved Document B Volume 1. | Not applicable | 30 min | No provision | From outside |
21. Flue walls described in Diagram 10.4. | Not applicable | Half the period given in Table B2 for the compartment wall/floor | Half the period given in Table B2 for the compartment wall/floor | From outside |
22. Construction described in note (a) to paragraph 12.9 of Approved Document B Volume 1. | Not applicable | 30 min | 30 min | From underside |
23. Fire doorsets | See Table C1 | See Appendix C | ||
NOTES:
Table B2 Minimum periods of fire resistance (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Table B2 Minimum periods of fire resistance.
| Purpose group of building | Minimum periods of fire resistance(1) (minutes) in a: | ||||||
|---|---|---|---|---|---|---|---|
| Basement storey* including floor over | Ground or upper storey | ||||||
| Depth (m) of the lowest basement | Height (m) of top floor above ground, in a building or separated part of a building | ||||||
| More than 10 | Up to 10 | Up to 5 | Up to 11 | Up to 18 | Up to 30 | More than 30 | |
1. Residential: a. Block of flats | |||||||
| – without sprinkler system | 90 min | 60 min | 30 min† | 60 min+§ | Not permitted(2) | Not permitted(2) | Not permitted(2) |
| – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min+§ | 60 min+§ | 90 min+ | 120 min+ |
b. and c. Dwellinghouse | Not applicable(4) | 30 min*† | 30 min† | 60 min(5) | 60 min(5) | Not applicable(4) | Not applicable(4) |
2. Residential | |||||||
a. Institutional | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
b. Other residential | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
3. Office: | |||||||
| – without sprinkler system | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | Not permitted(6) |
| – with sprinkler system(3) | 60 min | 60 min | 30 min† | 30 min† | 30 min† | 60 min | 120 min‡ |
4. Shop and commercial: | |||||||
| – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted(6) |
| – with sprinkler system(3) | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min‡ |
5. Assembly and recreation: | |||||||
| – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted(6) |
| – with sprinkler system(3) | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min‡ |
6. Industrial: | |||||||
| – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted(6) |
| – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
7. Storage and other nonresidential: a. any building or part not described elsewhere: | |||||||
| – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted(6) |
| – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
b. car park for light vehicles: | |||||||
i. open sided car park(7) Not applicable | Not applicable | 15 min†# | 15 min†#(8) | 15 min†#(8) | 15 min†#(8) | 60 min | |
ii. any other car park 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ | |
NOTES:
For single storey buildings, the periods under the heading ‘Up to 5’ apply. If single storey buildings have basements, for the basement storeys the period appropriate to their depth applies.
† For compartment walls that separate buildings, the period is increased to a minimum of 60 minutes.
+ For any floor that does not contribute to the support of the building within a flat of more than one storey, the period is reduced to 30 minutes.
§ For flat conversions, refer to paragraphs 6.5 to 6.7 of Approved Document B Volume 1 regarding the acceptability of 30 minutes.
‡ For elements that do not form part of the structural frame, the period is reduced to 90 minutes.
# For elements that protect the means of escape, the period is increased to 30 minutes.
Application of the fire resistance standards in Table B2 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Application of the fire resistance standards in Table B2.
B26 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: B26.
The following guidance should be used when applying the fire resistance standards in Table B2.
B27 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Appendix B: Performance of materials, products and structures.
For the purposes of this paragraph, the ground storey of a building that has one or more basement storeys and no upper storeys may be considered as a single storey building. The fire resistance of the basement storeys should be that specified for basements.
Table B3 Limitations on the use of uninsulated glazed elements on escape routes. These limitations do not apply to glazed elements that satisfy the relevant insulation criterion, see Table B1 (2029 amendment)
2029 amendment: takes effect on 2 September 2029. Until then the current text applies: Table B3 Limitations on the use of uninsulated glazed elements on escape routes. These limitations do not apply to glazed elements that satisfy the relevant insulation criterion, see Table B1.
| Position of glazed element | Maximum total glazed area in parts of a building with access to: | |||
|---|---|---|---|---|
| A single stair | More than one stair | |||
| Walls | Door leaf | Walls | Door leaf | |
| Flats | ||||
1. Within the enclosures of a protected entrance hall or protected landing, or within fire resisting separation shown in Section 3, Diagram 3.4 of Approved Document B Volume 1. | Fixed fanlights only | Unlimited above 1100mm from floor | Fixed fanlights only | Unlimited above 1100mm from floor |
| Dwellinghouses | ||||
2. Within either: a. the enclosures of a protected stairway b. fire resisting separation shown in Diagram 2.2 of Approved Document B Volume 1. | Unlimited above 1100mm from floor or pitch of the stair | Unlimited | Unlimited above 1100mm from floor or pitch of the stair | Unlimited |
3. Within fire resisting separation either: a. shown in Diagram 2.4 of Approved Document B Volume 1 b. described in paragraph 2.16b of Approved Document B Volume 1. | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
4. Existing window between an attached/ integral garage and the dwellinghouse. | Unlimited | Not applicable | Unlimited | Not applicable |
5. Adjacent to an external escape stair (see paragraph 2.17 and Diagram 2.7 of Approved Document B Volume 1) or roof escape route (see paragraph 2.13 of Approved Document B Volume 1). | Unlimited | Unlimited | Unlimited | Unlimited |
| General (except dwellinghouses) | ||||
6. Between residential/sleeping accommodation and a common escape route (corridor, lobby or stair). | Nil | Nil | Nil | Nil |
7. Between a protected stairway(1) and either: a. the accommodation b. a corridor that is not a protected corridor other than in item 6 above. | Nil | 25% of door area | Unlimited above 1100mm(2) | 50% of door area |
8. Between either: a. a protected stairway(1) and a protected lobby or protected corridor b. accommodation and a protected lobby other than in item 6 above. | Unlimited above 1100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
9. Between the accommodation and a protected corridor that forms a dead end, other than in item 6 above. | Unlimited above 1100mm from floor | Unlimited above 100mm from floor | Unlimited above 1100mm from floor | Unlimited above 100mm from floor |
10. Between accommodation and any other corridor, or sub-dividing corridors, other than in item 6 above. | Not applicable | Not applicable | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
11. Beside an external escape route. | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor |
12. Beside an external escape stair (see paragraph 3.32 and Diagram 3.4) or roof escape route (see paragraph 2.32). | Unlimited | Unlimited | Unlimited | Unlimited |
NOTES:
Items 1 and 8 apply also to single storey buildings.
Fire resisting glass should be marked with the name of the manufacturer and the name of the product.
Further guidance can be found in A Guide to Best Practice in the Specification and Use of Fire-resistant Glazed Systems published by the Glass and Glazing Federation.