Section 5: Walls
Section 5: Walls
5.1
This section gives guidance for four situations:
A wall includes piers, columns and parapets. It also includes chimneys if they are attached to the building. It does not include windows, doors and similar openings, but does include the joint between their frames and the wall. In the following, the term ‘precipitation’ includes the effects of spray blown from the sea or any other body of water adjacent to the building.
5.2
Walls should:
5.3
Consideration should be given to whether provisions 5.2(a) and (d) need apply to a building used wholly for:
Internal and external walls (moisture from the ground)
5.4
Any internal or external wall will meet the requirement if a damp proof course is provided.
Technical solution
5.5
An internal or external wall will meet the requirement if it is built as follows (unless it is subject to groundwater pressure, in which case see the Alternative approach – paragraph 5.6):
Alternative approach
5.6
The requirement can also be met by following the relevant recommendations of Clauses 4 and 5 of BS 8215:1991101. BS 8102:1990102 includes recommendations for walls subject to groundwater pressure including basement walls.
101 BS 8215:1991 Code of practice for design and installation of damp-proof courses in masonry construction.
102 BS 8102:1990 Code of practice for protection of structures against water from the ground.
Diagram 8 Damp proof courses (see paragraph 5.5(b))

Diagram 9 Protecting inner leaf (see paragraph 5.5(c))

External walls (moisture from the outside)
5.7
As well as giving protection against moisture from the ground, an external wall should give protection against precipitation. This protection can be given by a solid wall of sufficient thickness (see paragraphs 5.8 to 5.11), or by a cavity wall (see paragraphs 5.12 to 5.18), or by an impervious or weather-resisting cladding (see paragraphs 5.19 to 5.28).
Solid external walls
5.8
Any solid wall will meet the requirement if it will hold moisture arising from rain and snow until it can be released in a dry period without penetrating to the inside of the building, or causing damage to the building. The wall thickness will depend on the type of brick and block and on the severity of wind-driven rain. A method of describing the exposure to wind-driven rain is given in BS 8104:1992103; see also BS 5628-3:2001104.
Technical solution
5.9
A solid external wall in conditions of very severe exposure should be protected by external impervious cladding, but in conditions of severe exposure may be built as follows:
Premixed and proprietary renders should be used in accordance with the manufacturer’s instructions;
Diagram 10 Protection of wall head from precipitation (see paragraph 5.9(c))

5.10
Insulation. A solid external wall may be insulated on the inside or on the outside. Where it is on the inside a cavity should be provided to give a break in the path for moisture and where it is on the outside it should provide some resistance to the ingress of moisture to ensure the wall remains relatively dry (see Diagram 11).
103 BS 8104:1992 Code of practice for assessing exposure of walls to wind-driven rain.
104 BS 5628-3:2001 Code of practice for use of masonry. Materials and components, design and workmanship.
105 BS EN 998-2:2003 Specification for mortar for masonry. Masontry mortar.
106 BS 5262:1991 Code of practice for external renderings.
Alternative approach
5.11
The requirement can also be met by following the relevant recommendations of BS 5628-3:2001107. The code describes alternative constructions to suit the severity of the exposure and the type of brick or block.
Cavity external walls
5.12
Any external cavity wall will meet the requirement if the outer leaf is separated from the inner leaf by a drained air space, or in any other way which will prevent precipitation from being carried to the inner leaf.
Technical solution
5.13
The construction of a cavity external wall could include:
Masonry units should be laid on a full bed of mortar with the cross joints substantially and continuously filled to ensure structural robustness and weather resistance.
Where a cavity is to be partially filled, the residual cavity should not be less than 50mm wide (see Diagram 11).
Alternative approach
5.14
The requirement can also be met by following the relevant recommendations of BS 5628-3:2001108. The code describes factors affecting rain penetration of cavity walls.
Cavity insulation
5.15
A full or partial fill insulating material may be placed in the cavity between the outer leaf and an inner leaf of masonry subject to the following conditions:
107 BS 5628-3:2001 Code of practice for use of masonry. Materials and components, design and workmanship.
108 BS 5628-3:2001 Code of practice for use of masonry. Materials and components, design and workmanship.
109 BS 5617:1985 Specification for urea-formaldehyde (UF) foam systems suitable for thermal insulation of cavity walls with masonry or concrete inner and outer leaves.
110 BS 5618:1985 Code of practice for thermal insulation of cavity walls (with masonry or concrete inner and outer leaves) by filling with urea-formaldehyde (UF) foam systems.
111 BS 8208-1:1985 Guide to assessment of suitability of external cavity walls for filling with thermal insulation.
Diagram 11 Insulated external walls: examples (see paragraphs 5.10, 5.13 and 5.17)

Diagram 12 UK zones for exposure to driving rain

Table 4 Maximum recommended exposure zones for insulated masonry walls
| Wall construction | Maximum recommended exposure zone for each construction | |||||||
|---|---|---|---|---|---|---|---|---|
| Insulation method | Min. width of filled or clear cavity (mm) | Impervious cladding | Rendered finish | Facing masonry | ||||
| Full height of wall | Above facing masonry | Full height of wall | Above facing masonry | Tooled flush joints | Recessed mortar joints | Flush sills and copings | ||
| Built-in full fill | 50 | 4 | 3 | 3 | 3 | 2 | 1 | 1 |
| 75 | 4 | 3 | 4 | 3 | 3 | 1 | 1 | |
| 100 | 4 | 4 | 4 | 3 | 3 | 1 | 2 | |
| 125 | 4 | 4 | 4 | 3 | 3 | 1 | 2 | |
| 150 | 4 | 4 | 4 | 4 | 4 | 1 | 2 | |
| Injected fill not UF foam | 50 | 4 | 2 | 3 | 2 | 2 | 1 | 1 |
| 75 | 4 | 3 | 4 | 3 | 3 | 1 | 1 | |
| 100 | 4 | 3 | 4 | 3 | 3 | 1 | 1 | |
| 125 | 4 | 4 | 4 | 3 | 3 | 1 | 2 | |
| 150 | 4 | 4 | 4 | 4 | 4 | 1 | 2 | |
| Injected fill UF foam | 50 | 4 | 2 | 3 | 2 | 1 | 1 | 1 |
| 75 | 4 | 2 | 3 | 2 | 2 | 1 | 1 | |
| 100 | 4 | 2 | 3 | 2 | 2 | 1 | 1 | |
| Partial fill | ||||||||
| Residual 50mm cavity | 50 | 4 | 4 | 4 | 4 | 3 | 1 | 1 |
| Residual 75mm cavity | 75 | 4 | 4 | 4 | 4 | 4 | 1 | 1 |
| Residual 100mm cavity | 100 | 4 | 4 | 4 | 4 | 4 | 2 | 1 |
| Internal insulation | ||||||||
| Clear cavity 50mm | 50 | 4 | 3 | 4 | 3 | 3 | 1 | 1 |
| Clear cavity 100mm | 100 | 4 | 4 | 4 | 4 | 4 | 2 | 2 |
| Fully filled cavity 50mm | 50 | 4 | 3 | 3 | 3 | 2 | 1 | 1 |
| Fully filled cavity 100mm | 100 | 4 | 4 | 4 | 3 | 3 | 1 | 2 |
5.16
If the map given in Diagram 12 is used, determine the national exposure and, where appropriate, apply the following modifiers:
(The national exposure zone value can be more accurately calculated from the larger scale maps and correction factors given in BS 8104:1992112.)
112 BS 8104:1992 Code of practice for assessing exposure of walls to wind-driven rain.
Determine the recommended constructions from the modified exposure zone values given in Table 4. Further guidance as to the use of this table is given in BRE Report 262113.
Framed external walls
5.17
Any framed external wall will meet the requirement if the cladding is separated from the insulation or sheathing by a vented and drained cavity with a membrane that is vapour open, but resists the passage of liquid water, on the inside of the cavity (see Diagram 11).
Cracking of external walls
5.18
Severe rain penetration may occur through cracks in masonry external walls caused by thermal movement in hot weather or subsidence after prolonged droughts. The possibility of this should be taken into account when designing a building. Detailed guidance is given in:
Impervious cladding systems for walls
5.19
Cladding systems for walls should:
5.20
Cladding can be designed to protect a building from precipitation (often driven by the wind) either by holding it at the face of the building or by stopping it from penetrating beyond the back of the cladding.
5.21
Any cladding will meet the requirement if:
5.22
Some materials can deteriorate rapidly without special care and they should only be used as the weather-resisting part of a cladding system if certain conditions are met (see Approved Document 7, Materials and workmanship). The weather-resisting part of a cladding system does not include paint nor does it include any coating, surfacing or rendering which will not itself provide all the weather resistance.
Technical solution
5.23
Cladding may be:
5.24
Dry joints between cladding units should be designed so that precipitation will not pass through them, or the cladding should be designed so that precipitation which enters the joints will be directed towards the exposed face without it penetrating beyond the back of the cladding. Note: Whether dry joints are suitable will depend on the design of the joint or the design of the cladding and the severity of the exposure to wind and rain.
5.25
Each sheet, tile and section of cladding should be securely fixed. Guidance as to appropriate fixing methods is given in BS 8000-6:1990117. Particular care should be taken with detailing and workmanship at the junctions between cladding and window and door openings as they are vulnerable to moisture ingress.
5.26
Insulation can be incorporated into the construction provided it is either protected from moisture or unaffected by it.
5.27
Where cladding is supported by timber components or is on the façade of a timber framed building, the space between the cladding and the building should be ventilated to ensure rapid drying of any water that penetrates the cladding.
113 BRE Report BR 262 Thermal insulation: avoiding risks, 2002.
114 BRE Report 352 BRE Building elements: Walls, windows and doors, 2002.
115 BRE Report BR 292 Cracking in buildings, 1995.
116 BS 5628-3:2001 Code of practice for use of masonry. Materials and components, design and workmanship.
117 BS 8000-6:1990 Workmanship on building sites. Code of practice for slating and tiling of roofs and claddings.
Alternative approach
5.28
The requirement can also be met by following the relevant recommendations of:
These documents describe the materials and contain design considerations including recommendations for fixing.
Joint between doors and windows
5.29
The joint between walls and door and window frames should:
5.30
Damp-proof courses should be provided to direct moisture towards the outside:
5.31
In some cases the width of the cavity due to thermal insulation and the 50mm clearance for drainage may be such that the window frame is not wide enough to completely cover the cavity closer. The reveal may need to be lined with plasterboard, dry lining, a support system or a thermal backing board. Direct plastering of the internal reveal should only be used with a backing of expanded metal lathing or similar.
5.32
In areas of the country in driving rain exposure zone 4 checked rebates should be used in all window and door reveals. The frame should be set back behind the outer leaf of masonry, which should overlap it as shown in Diagram 13. Alternatively an insulated finned cavity closer may be used.
Diagram 13 Window reveals for use in areas of severe or very severe exposure to driving rain (see paragraph 5.32)

Door thresholds
5.33
Where an accessible threshold is provided to allow unimpeded access, as specified in Part M, Access to and use of buildings, it will meet the requirement if:
118 BS CP 143 Code of practice for sheet roof and wall coverings.
119 BS 6915:2001 Design and construction of fully supported lead sheet roof and wall coverings. Code of practice.
120 BS 8219:2001 Installation of sheet roof and wall coverings. Profiled fibre cement. Code of practice.
121 BS 8200:1985 Code of practice for the design of nonloadbearing external vertical enclosures of buildings.
122 BS 8297:2000 Code of practice for design and installation of non-loadbearing precast concrete cladding.
123 BS 8298:1994 Code of practice for design and installation of natural stone cladding and lining.
124 MCRMA Technical Paper 6 Profiled metal roofing design guide, revised edition, 1996.
125 MCRMA Technical Paper 9 Composite roof and wall cladding panel design guide, 1995.
Further advice for the development of accessible thresholds is given in BRE GBG 47126 and the TSO document127.
Diagram 14 Accessible threshold for use in exposed areas128 (see paragraph 5.33)

External walls (resistance to damage from interstitial condensation)
5.34
An external wall will meet the requirement if it is designed and constructed in accordance with Clause 8.3 of BS 5250:2002129, and BS EN ISO 13788:2002130.
5.35
Because of the high internal temperatures and humidities, there is a particular risk of interstitial condensation in the walls of swimming pools and other buildings in which high levels of moisture are generated; specialist advice should be sought when these are being designed.
External walls (resistance to surface condensation and mould growth)
5.36
An external wall will meet the requirement if:
99 Accredited Construction Details which can be downloaded from www.planningportal.gov.uk/buildingregulations/approveddocuments/partl/bcassociateddocuments9/acd.
126 BRE GBG 47 Level external thresholds: reducing moisture penetration and thermal bridging, 2001.
127 Accessible thresholds in new buildings: guidance for house builders and designers, TSO, 1999.
128 The drainage channel and adjacent paving and threshold are usually made up from precast concrete or other pre-formed components.
129 BS 5250:2002 Code of practice for the control of condensation in buildings.
130 BS EN ISO 13788:2002 Hygrothermal performance of building components and building elements. Internal surface temperature to avoid critical surface humidity and interstitial condensation. Calculation methods.
132 BRE Information Paper IP17/01 Assessing the effects of thermal bridging at junctions and around openings, 2001.